API 1104 · ASME B31.3
NPS 2 Schedule 40 GTAW girth weld
A small shop spool has a thin Schedule 40 wall and a GTAW sequence with the dedicated hot pass omitted.
Engineering screening only. Verify the applicable code, material and qualified WPS/PQR before production use.
Inputs
Live weld sheet
Updated from inputsCycle time budget · 10.03 min planned vs 15 min budget.
Result details
| Deposited filler per joint | 0.042 lb |
|---|---|
| Estimated passes | 2 |
| Joint arc time | 4.03 min |
| Total joint cycle | 10.03 min |
| Effective wall | 0.154 in |
| Pipe outside diameter | 2.375 in |
| Pipe bore | 2.067 in |
| Groove centroid circumference | 7.1 in |
| Outside circumference | 7.46 in |
| Root circumference | 6.49 in |
| Groove mouth width | 0.223 in |
| Uncapped groove section | 0.019 in² |
| Groove and cap volume | 0.15 in³ |
| Filler purchase per joint | 0.044 lb |
| Root passes | 1 |
| Hot passes | 0 |
| Fill passes | 0 |
| Cap beads | 1 |
| Cycle time margin | 4.97 min |
Worked example
Starting inputs
- Nominal pipe size
- NPS 2
- Wall source
- Schedule 40
- Primary included angle
- 70 °
- Root opening
- 0.062598 in
- Root land
- 0.03937 in
- Overall filler process
- GTAW
- Dedicated hot pass
- Skip hot pass
Baseline results
- Deposited filler per joint
- 0.042 lb
- Estimated passes
- 2
- Joint arc time
- 4.03 min
- Total joint cycle
- 10.03 min
The 0.019 in² groove runs around a 7.1 in centroid circumference before cap allowance. The sequence adds 1 root, 0 hot, 0 fill and 1 cap passes over 4.03 min of arc time.
Try it. The root travels on the bore circumference. The cap travels on the larger outside circumference.
Calculation method
V = ∫ 2πr·w(r)dr + A꜀·π·OD · Arc time = Σ pass length / travel speed
The model integrates the piecewise linear groove width at each radius. Cap reinforcement is a percentage of groove area revolved at the outside diameter. Schedule presets cover a subset of common B36.10 walls. Confirm actual wall and ovality at the joint.
Reserve one root pass and an optional hot pass. Cap beads must cover the groove mouth and deposit the entered extra cap area. Root, hot and cap allowances are 0.60, 0.75 and 0.80 times the entered fill area per pass. Apply the unused cap-bead area to the groove, then round up the remaining fill passes. Root, hot/fill and cap times use the root, centroid and outside circumferences.
Cycle time adds the entered fit-up, interpass and handling allowance. Actual pass placement, reinforcement profile, deposition rates and essential variables come from the qualified procedure.