NPS 6 Schedule 80 multipass girth weld

A heavy-walled NPS 6 process line uses a wider V and a discrete hot pass.

Engineering screening only. Verify the applicable code, material and qualified WPS/PQR before production use.

Inputs

Pipe & preparation
°
mm
mm
%
Passes & cycle
kg/m³
mm²
mm
mm/min
mm/min
mm/min
min
min

Live weld sheet

Updated from inputs
Girth-weld groove sectionDeposited filler per joint 0.393 kg. Estimated passes 8. Joint arc time 34.27 min. Total joint cycle 50.27 min NET FILLER0.393kgPASS COUNT8ARC TIME34.27minJOINT CYCLE50.27min GIRTH-WELD GROOVE SECTION Wall 10.97 mmR1 · H1 · F4 · C2NPS 6 CYCLE TIME BUDGETPASS
Pass · within screen

Cycle time budget · 50.27 min planned vs 58 min budget.

Result details

Deposited filler per joint0.393 kg
Estimated passes8
Joint arc time34.27 min
Total joint cycle50.27 min
Effective wall10.97 mm
Pipe outside diameter168.275 mm
Pipe bore146.335 mm
Groove centroid circumference503.47 mm
Outside circumference528.65 mm
Root circumference459.72 mm
Groove mouth width15.066 mm
Uncapped groove section90.043 mm²
Groove and cap volume50.09 cm³
Filler purchase per joint0.605 kg
Root passes1
Hot passes1
Fill passes4
Cap beads2
Cycle time margin7.73 min

Worked example

Starting inputs

Nominal pipe size
NPS 6
Wall source
Schedule 80
Primary included angle
65 °
Root opening
3 mm
Root land
1.5 mm
Overall filler process
SMAW
Fill area per pass
15 mm²

Baseline results

Deposited filler per joint
0.393 kg
Estimated passes
8
Joint arc time
34.27 min
Total joint cycle
50.27 min

The 90.043 mm² groove runs around a 503.47 mm centroid circumference before cap allowance. The sequence adds 1 root, 1 hot, 4 fill and 2 cap passes over 34.27 min of arc time.

Try it. Narrower cap beads require more full revolutions. Compare the cap pass count and total cycle.

Calculation method

V = ∫ 2πr·w(r)dr + A꜀·π·OD · Arc time = Σ pass length / travel speed

The model integrates the piecewise linear groove width at each radius. Cap reinforcement is a percentage of groove area revolved at the outside diameter. Schedule presets cover a subset of common B36.10 walls. Confirm actual wall and ovality at the joint.

Reserve one root pass and an optional hot pass. Cap beads must cover the groove mouth and deposit the entered extra cap area. Root, hot and cap allowances are 0.60, 0.75 and 0.80 times the entered fill area per pass. Apply the unused cap-bead area to the groove, then round up the remaining fill passes. Root, hot/fill and cap times use the root, centroid and outside circumferences.

Cycle time adds the entered fit-up, interpass and handling allowance. Actual pass placement, reinforcement profile, deposition rates and essential variables come from the qualified procedure.

References