Worked example
Steep driveway crossing with a CMP culvert
A roadside crossing collects 1.6 ac at the driveway entrance. The initial barrel check assumes corrugated metal with a 4.5% grade.
Estimate
Estimated peak runoff
- The barrel screen assumes steady full flow. A culvert design also checks inlet control, tailwater, headwater, debris and outlet conditions.
- Peak runoff · US gallons
- 1,365.7 US gpm
- Composite runoff coefficient
- 0.46
- Preliminary nominal pipe
- 12 in
- Theoretical full-flow diameter
- 10.74 in
- Selected barrel capacity
- 4.0936 ft³/s
- Full-flow velocity
- 5.212 ft/s
- Peak flow ÷ full area
- 3.874 ft/s
Download
Working this example
Starting estimate 3.0427 ft³/sEstimated peak runoff
Compare inlet headwater and outlet scour for the actual profile. Verify the corrugation pattern before using the preset roughness.
Questions & answers
Why use a higher Manning n for this corrugated metal barrel?
Corrugations can add flow resistance. Use the product’s corrugation and diameter data for the actual roughness.
Which slope do I enter for the driveway CMP culvert?
Use the barrel invert fall divided by its horizontal length, expressed as a percentage.