ConcreteEarthLab

Worked example

Steep driveway crossing with a CMP culvert

A roadside crossing collects 1.6 ac at the driveway entrance. The initial barrel check assumes corrugated metal with a 4.5% grade.

Inputs

Measurement system
ac
in/h
Use local intensity for the design return period and time of concentration.
%
CATCHMENT TO CULVERTIllustrative runoff path to a circular culvert. Pipe capacity is screened at full flow. CATCHMENT TO CULVERT C 0.46 · 1.6 acØ 12 in · slope 4.5%Peak 3.043 ft³/s

Estimate

Estimated peak runoff
3.0427 ft³/s
  • The barrel screen assumes steady full flow. A culvert design also checks inlet control, tailwater, headwater, debris and outlet conditions.
Peak runoff · US gallons
1,365.7 US gpm
Composite runoff coefficient
0.46
Preliminary nominal pipe
12 in
Theoretical full-flow diameter
10.74 in
Selected barrel capacity
4.0936 ft³/s
Full-flow velocity
5.212 ft/s
Peak flow ÷ full area
3.874 ft/s
Download

Working this example

Starting estimate 3.0427 ft³/sEstimated peak runoff

Compare inlet headwater and outlet scour for the actual profile. Verify the corrugation pattern before using the preset roughness.

See the calculator formulas and assumptions

Questions & answers

Why use a higher Manning n for this corrugated metal barrel?

Corrugations can add flow resistance. Use the product’s corrugation and diameter data for the actual roughness.

Which slope do I enter for the driveway CMP culvert?

Use the barrel invert fall divided by its horizontal length, expressed as a percentage.