Metric runoff and RCP sizing for an industrial lot

A 2.1 ha industrial lot has 78% hard cover. The concrete barrel screen uses 82 mm/h rainfall, a 0.8% slope and n = 0.013.

Inputs

Measurement system
ha
%
mm/h
Use local intensity for the design return period and time of concentration.
%
CATCHMENT TO CULVERTIllustrative runoff path to a circular culvert. Pipe capacity is screened at full flow. CATCHMENT TO CULVERT C 0.805 · 2.1 haØ 533.4 mm · slope 0.8%Peak 0.385 m³/s

Estimate

Estimated peak runoff
0.3849 m³/s
  • The barrel screen assumes steady full flow. A culvert design also checks inlet control, tailwater, headwater, debris and outlet conditions.
Peak runoff · equivalent
13.591 ft³/s
Peak runoff · US gallons
6,100.3 US gpm
Composite runoff coefficient
0.805
Preliminary nominal pipe
533.4 mm
Theoretical full-flow diameter
525.11 mm
Selected barrel capacity
0.4013 m³/s
Full-flow velocity
1.796 m/s
Peak flow ÷ full area
1.722 m/s
Download

Working this example

Starting estimate 0.3849 m³/sEstimated peak runoff

Verify the selected reinforced concrete pipe’s actual internal diameter and the next locally stocked size.

See the calculator formulas and assumptions

Questions & answers

What metric factor turns hectares and millimeters per hour into cubic meters per second?

One hectare receives 10 m³/h per mm/h of rain. Divide by 3,600 seconds per hour, giving Q = C × i × A ÷ 360.

Does the metric RCP size label mean the inside diameter is exact?

It shows the metric equivalent of a nominal size in the screening table. Confirm the manufacturer’s actual inside diameter.