Worked example
Culvert velocity screen at a shallow grade
A low-gradient swale crosses under a light-duty lane. The RCP barrel check uses only 0.1% fall and compares full-flow velocity with a screening band.
Estimate
Estimated peak runoff
- Full-bore velocity falls outside the 2.5–10 ft/s screening band. Review sediment and outlet protection criteria.
- The barrel screen assumes steady full flow. A culvert design also checks inlet control, tailwater, headwater, debris and outlet conditions.
- Peak runoff · US gallons
- 293.3 US gpm
- Composite runoff coefficient
- 0.45
- Preliminary nominal pipe
- 12 in
- Theoretical full-flow diameter
- 10.32 in
- Selected barrel capacity
- 0.9764 ft³/s
- Full-flow velocity
- 1.243 ft/s
- Peak flow ÷ full area
- 0.832 ft/s
Download
Working this example
Starting estimate 0.6534 ft³/sEstimated peak runoff
Compare actual flow depth, sediment load and maintenance access before choosing pipe size or slope.
Questions & answers
Why can the shallow-grade pipe meet capacity and still raise a velocity flag?
Capacity measures discharge. A comparatively large flow area on a flat slope can carry the flow at a low mean velocity.
Is peak flow divided by full pipe area the actual shallow-grade outlet velocity?
It is a comparison using the full area. Actual outlet velocity depends on the hydraulic control and wetted area.