Roof and planted surfaces feed an on-site swale. In the starting case, the roof contributes 71% of the delineated 0.9 ac catchment.

Inputs

Measurement system
ac
%
in/h
Use local intensity for the design return period and time of concentration.
%
CATCHMENT TO CULVERTIllustrative runoff path to a circular culvert. Pipe capacity is screened at full flow. CATCHMENT TO CULVERT C 0.761 · 0.9 acØ 12 in · slope 2.2%Peak 3.247 ft³/s

Estimate

Estimated peak runoff
3.2467 ft³/s
  • The barrel screen assumes steady full flow. A culvert design also checks inlet control, tailwater, headwater, debris and outlet conditions.
Peak runoff · US gallons
1,457.2 US gpm
Composite runoff coefficient
0.761
Preliminary nominal pipe
12 in
Theoretical full-flow diameter
9.39 in
Selected barrel capacity
6.245 ft³/s
Full-flow velocity
7.951 ft/s
Peak flow ÷ full area
4.134 ft/s
Download

Working this example

Starting estimate 3.2467 ft³/sEstimated peak runoff

If roof drains bypass the swale, remove both their area and their weighted coefficient contribution for this outlet.

See the calculator formulas and assumptions

Questions & answers

What does the warehouse roof percentage represent in composite C?

It is the roof area divided by the total area that reaches the same point of interest.

How do I model three land cover types for the roof and swale?

Calculate the weighted average of all three surfaces separately, then enter that value in single-coefficient mode.