ConcreteEarthLab

Worked example

Farm lane culvert below a 14 ac field

A farm access lane crosses drainage from 14 ac. The scenario combines compacted track and vegetated field cover, then screens a CMP barrel.

Inputs

Measurement system
ac
%
in/h
Use local intensity for the design return period and time of concentration.
%
CATCHMENT TO CULVERTIllustrative runoff path to a circular culvert. Pipe capacity is screened at full flow. CATCHMENT TO CULVERT C 0.374 · 14 acØ 30 in · slope 0.7%Peak 14.783 ft³/s

Estimate

Estimated peak runoff
14.783 ft³/s
  • The barrel screen assumes steady full flow. A culvert design also checks inlet control, tailwater, headwater, debris and outlet conditions.
Peak runoff · US gallons
6,635.1 US gpm
Composite runoff coefficient
0.374
Preliminary nominal pipe
30 in
Theoretical full-flow diameter
28.37 in
Selected barrel capacity
17.1578 ft³/s
Full-flow velocity
3.495 ft/s
Peak flow ÷ full area
3.012 ft/s
Download

Working this example

Starting estimate 14.783 ft³/sEstimated peak runoff

Review field contours, ditch paths and debris exposure. The surface area that drains to the crossing may change after grading.

See the calculator formulas and assumptions

Questions & answers

How do I choose acreage for this farm lane runoff estimate?

Delineate the land and connecting channels that drain to the crossing. Property lines matter only where they also define drainage divides.

Why does this farm-lane screen leave out debris blockage?

The barrel capacity assumes a clear, full circular section. Debris and entrance conditions require separate evaluation.