Deep horizontal bare anode

A single 6 m bare anode is modeled at 3.4 m centerline depth in soil measured at 28 Ω·m.

Inputs

SI units

Use surrounding soil resistivity. For low-resistance coke backfill, the optional effective diameter is the column outside diameter.

Ω·m
m
m
m
m
m
A
Ω
Groundbed
3.503 Ω
Single anode
3.503 Ω
Crowding
1 ×
Bed drop
63.05 V

Anode field and interaction

Schematic
Anode field and interaction (schematic, not to scale)Trench end section1 anodeEFFECTIVE Ø0.12 mBURIAL DEPTH3.4 mROW RESISTANCE3.503 Ω
Above resistance target

Review soil resistivity, electrode spacing and effective backfill dimensions before relying on this layout.

Modeled resistance ÷ selected target

Calculation details

Effective anode diameter
0.12 m
Ideal parallel resistance
3.5026 Ω
Mutual resistance term
0 Ω
Total modeled resistance
3.5026 Ω
Target minus modeled resistance
-2.5026 Ω
Ideal-parallel efficiency
100 %

Worked calculation

Starting values · SI
  1. The single electrode has 3.50261 Ω using the horizontal geometry and 0.12 m effective diameter.
  2. Ideal parallel resistance is 3.50261 Ω. Adding 0 Ω gives 3.50261 Ω.
  3. At 18 A, groundbed voltage drop is 63.04701 V.

The trench depth affects the image term without a row correction. Recheck resistivity below the surface at the actual burial depth.

Method and limits

  1. Estimate a single anode

    For a shallow vertical electrode, R = ρ[ln(8L/d) − 1]/(2πL). Use the conductive coke column diameter and length when it functions as an equivalent electrode.

  2. Apply trench depth if horizontal

    With centerline depth h, set s = 2h and q = √(s² + L²). Dwight’s horizontal bracket is ln[4L(L + q)/(d × s)] + (s − q)/L − 1. Multiply by ρ/(2πL).

  3. Estimate row interaction

    With N > 1, add ρ × ln(0.656N)/(πNS) to R_single/N for center spacing S. This Sunde term is for a vertical row. Applying it to parallel horizontal trenches is an approximation. The voltage drop is design current × modeled bed resistance.