A/B capacity topology
Usable IT headroom 240 kW
Inputs
Calculation details
| Measure | Value |
|---|---|
| Real rating per module | 450 kW |
| Installed rating per path | 2,250 kW |
| Total installed nameplate | 4,500 kW |
| Protected capacity before design cap | 1,800 kW |
| Capacity on a path with one module removed | 1,800 kW |
| Surviving capacity with one full path isolated | 2,250 kW |
| Maintenance ceiling with standby reserve held | 1,800 kW |
| Usable IT at design cap | 1,440 kW |
| Usable capacity assigned to planned load | 1,200 kW |
| Capacity allocated to redundancy | 2,700 kW |
| Capacity withheld by utilization cap | 360 kW |
| Unassigned usable capacity | 240 kW |
| Usable IT headroom against plan | 240 kW |
| Usable share of installed nameplate | 32 % |
| Installed module capex | 700,000 $ |
| Module capex per usable IT kW | 486 $/kW |
Update the highlighted inputs to see the results.
Calculation method
- Module kW = module kVA × rated power factor
- Protected kW = (modules per path − spare modules) × module kW
- Design IT limit = protected kW × utilization cap
Dual paths are equal in size and either path can carry the modeled load. The path-isolated ceiling keeps the specified module reserve on the surviving path. Usable capacity is split into assigned load and idle headroom. Stranded kW is the amount withheld by the design cap.
Engineering limits
A single-path design has zero capacity through an isolated path. Module redundancy alone cannot establish a Tier classification. Concurrent maintainability also depends on the physical distribution, isolation, component arrangements and maintenance procedures.
Worked examples
DataCenterPUELab · Calculation sheet
Tier redundancy & usable IT capacity calculator
Usable IT headroom 240 kW
Inputs
- Redundancy scheme
- 2(N+1)
- Modules per path
- 5
- Rating per module
- 500 kVA
- Rated power factor
- 0.9
- Design utilization cap
- 80 %
- Planned IT load
- 1200 kW
- Installed cost per module
- 70000 $
Results
- Real rating per module
- 450 kW
- Installed rating per path
- 2,250 kW
- Total installed nameplate
- 4,500 kW
- Protected capacity before design cap
- 1,800 kW
- Capacity on a path with one module removed
- 1,800 kW
- Surviving capacity with one full path isolated
- 2,250 kW
- Maintenance ceiling with standby reserve held
- 1,800 kW
- Usable IT at design cap
- 1,440 kW
- Usable capacity assigned to planned load
- 1,200 kW
- Capacity allocated to redundancy
- 2,700 kW
- Capacity withheld by utilization cap
- 360 kW
- Unassigned usable capacity
- 240 kW
- Usable IT headroom against plan
- 240 kW
- Usable share of installed nameplate
- 32 %
- Installed module capex
- 700,000 $
- Module capex per usable IT kW
- 486 $/kW
Screening estimate. Confirm against facility and manufacturer data for engineering decisions.