N single-path installed capacity
A small room has three required modules and one distribution path. Screen its normal capacity and maintenance exposure.
Engineering schematic
A/B capacity topology
Usable IT headroom 60 kW
Inputs
Calculation details
| Measure | Value |
|---|---|
| Real rating per module | 225 kW |
| Installed rating per path | 675 kW |
| Total installed nameplate | 675 kW |
| Protected capacity before design cap | 675 kW |
| Capacity on a path with one module removed | 450 kW |
| Surviving capacity with one full path isolated | 0 kW |
| Maintenance ceiling with standby reserve held | 0 kW |
| Usable IT at design cap | 540 kW |
| Usable capacity assigned to planned load | 480 kW |
| Capacity allocated to redundancy | 0 kW |
| Capacity withheld by utilization cap | 135 kW |
| Unassigned usable capacity | 60 kW |
| Usable IT headroom against plan | 60 kW |
| Usable share of installed nameplate | 80 % |
| Installed module capex | 129,000 $ |
| Module capex per usable IT kW | 239 $/kW |
Update the highlighted inputs to see the results.
Starting calculation
- Each 250 kVA module at 0.9 power factor supplies 225 kW. Holding the topology reserve leaves 675 kW protected.
- Apply the 80% design cap to get 540 kW usable. The planned load leaves 60 kW of headroom.
Compare normal design capacity with the path-isolation row. The single path cannot support the load while isolated.
Calculation method
- Module kW = module kVA × rated power factor
- Protected kW = (modules per path − spare modules) × module kW
- Design IT limit = protected kW × utilization cap
Dual paths are equal in size and either path can carry the modeled load. The path-isolated ceiling keeps the specified module reserve on the surviving path. Usable capacity is split into assigned load and idle headroom. Stranded kW is the amount withheld by the design cap.
Engineering limits
A single-path design has zero capacity through an isolated path. Module redundancy alone cannot establish a Tier classification. Concurrent maintainability also depends on the physical distribution, isolation, component arrangements and maintenance procedures.
Related worked examples
DataCenterPUELab · Calculation sheet
N single-path installed capacity
Usable IT headroom 60 kW
Inputs
- Redundancy scheme
- N
- Modules per path
- 3
- Rating per module
- 250 kVA
- Rated power factor
- 0.9
- Design utilization cap
- 80 %
- Planned IT load
- 480 kW
- Installed cost per module
- 43000 $
Results
- Real rating per module
- 225 kW
- Installed rating per path
- 675 kW
- Total installed nameplate
- 675 kW
- Protected capacity before design cap
- 675 kW
- Capacity on a path with one module removed
- 450 kW
- Surviving capacity with one full path isolated
- 0 kW
- Maintenance ceiling with standby reserve held
- 0 kW
- Usable IT at design cap
- 540 kW
- Usable capacity assigned to planned load
- 480 kW
- Capacity allocated to redundancy
- 0 kW
- Capacity withheld by utilization cap
- 135 kW
- Unassigned usable capacity
- 60 kW
- Usable IT headroom against plan
- 60 kW
- Usable share of installed nameplate
- 80 %
- Installed module capex
- 129,000 $
- Module capex per usable IT kW
- 239 $/kW
Screening estimate. Confirm against facility and manufacturer data for engineering decisions.