2N independent power paths
The facility has two identical trains of four modules with only one train needed to carry the design load.
Engineering schematic
A/B capacity topology
Usable IT headroom 152 kW
Inputs
Calculation details
| Measure | Value |
|---|---|
| Real rating per module | 480 kW |
| Installed rating per path | 1,920 kW |
| Total installed nameplate | 3,840 kW |
| Protected capacity before design cap | 1,920 kW |
| Capacity on a path with one module removed | 1,440 kW |
| Surviving capacity with one full path isolated | 1,920 kW |
| Maintenance ceiling with standby reserve held | 1,920 kW |
| Usable IT at design cap | 1,632 kW |
| Usable capacity assigned to planned load | 1,480 kW |
| Capacity allocated to redundancy | 1,920 kW |
| Capacity withheld by utilization cap | 288 kW |
| Unassigned usable capacity | 152 kW |
| Usable IT headroom against plan | 152 kW |
| Usable share of installed nameplate | 42.5 % |
| Installed module capex | 576,000 $ |
| Module capex per usable IT kW | 353 $/kW |
Update the highlighted inputs to see the results.
Starting calculation
- Each 500 kVA module at 0.96 power factor supplies 480 kW. Holding the topology reserve leaves 1,920 kW protected.
- Apply the 85% design cap to get 1,632 kW usable. The planned load leaves 152 kW of headroom.
Use cost per usable kW to compare the A/B topology with a single path at the same demand.
Calculation method
- Module kW = module kVA × rated power factor
- Protected kW = (modules per path − spare modules) × module kW
- Design IT limit = protected kW × utilization cap
Dual paths are equal in size and either path can carry the modeled load. The path-isolated ceiling keeps the specified module reserve on the surviving path. Usable capacity is split into assigned load and idle headroom. Stranded kW is the amount withheld by the design cap.
Engineering limits
A single-path design has zero capacity through an isolated path. Module redundancy alone cannot establish a Tier classification. Concurrent maintainability also depends on the physical distribution, isolation, component arrangements and maintenance procedures.
Related worked examples
DataCenterPUELab · Calculation sheet
2N independent power paths
Usable IT headroom 152 kW
Inputs
- Redundancy scheme
- 2N
- Modules per path
- 4
- Rating per module
- 500 kVA
- Rated power factor
- 0.96
- Design utilization cap
- 85 %
- Planned IT load
- 1480 kW
- Installed cost per module
- 72000 $
Results
- Real rating per module
- 480 kW
- Installed rating per path
- 1,920 kW
- Total installed nameplate
- 3,840 kW
- Protected capacity before design cap
- 1,920 kW
- Capacity on a path with one module removed
- 1,440 kW
- Surviving capacity with one full path isolated
- 1,920 kW
- Maintenance ceiling with standby reserve held
- 1,920 kW
- Usable IT at design cap
- 1,632 kW
- Usable capacity assigned to planned load
- 1,480 kW
- Capacity allocated to redundancy
- 1,920 kW
- Capacity withheld by utilization cap
- 288 kW
- Unassigned usable capacity
- 152 kW
- Usable IT headroom against plan
- 152 kW
- Usable share of installed nameplate
- 42.5 %
- Installed module capex
- 576,000 $
- Module capex per usable IT kW
- 353 $/kW
Screening estimate. Confirm against facility and manufacturer data for engineering decisions.