Recovery with limited charger current
A 25 A charger has limited current available after a 180 kW UPS discharge.
Engineering schematic
DC battery bus & inverter
Runtime headroom 18.6 min
Inputs
Calculation details
| Measure | Value |
|---|---|
| Series cells per string | 240 cells |
| End-of-discharge bus voltage | 427.2 V |
| Inverter DC input | 187.5 kW |
| Bank discharge current at cutoff | 438.9 A |
| Discharge current per installed string | 146.3 A |
| Installed bank capacity at C20 | 390 Ah |
| Bank C20 reference current | 19.5 A |
| Minimum modeled C20 bank capacity | 162.46 Ah |
| Parallel strings required for target | 2 strings |
| Modeled autonomy at entered load | 28.6 min |
| Runtime headroom against target | 18.6 min |
| UPS inverter heat | 7.5 kW |
| UPS inverter heat | 25,591 Btu/h |
| Amp-hours withdrawn in modeled discharge | 209.22 Ah |
| Bulk charge time to recover 90% of withdrawn Ah | 9.41 h |
Update the highlighted inputs to see the results.
Starting calculation
- Multiply 240 cells by 1.78 V to get 427.2 V at cutoff. The inverter draws 438.9 A DC at this voltage.
- Apply Peukert’s exponent to 390 Ah of C20 capacity. The model gives 28.6 minutes and requires 2 strings for the target.
Doubling available charge current halves the idealized bulk recovery time at the same charge efficiency.
Calculation method
- Idc = IT kW × 1,000 ÷ (ηinv × cell count × Vcutoff)
- Peukert hours = 20 × [(bank C20 ÷ 20) ÷ Idc]ᵏ
- Charge recovery hours = 0.90 × Ah withdrawn ÷ (charger A × charge efficiency)
The nominal 480 V or 540 V bus uses 240 or 270 nominal 2 V cells in series per string. Current is held at the calculated end-of-discharge value. Runtime is capped at the nominal amp-hour limit at low current. Recharge assumes a constant available charger current during bulk charge.
Engineering limits
Use vendor constant-power discharge tables, temperature and aging corrections, and the full duty cycle for IEEE 485 sizing. The estimate covers lead-acid batteries. Recovery time refers to amp-hours withdrawn in the modeled discharge, with charger taper and float omitted.
Related worked examples
DataCenterPUELab · Calculation sheet
Recovery with limited charger current
Runtime headroom 18.6 min
Inputs
- IT load on UPS
- 180 kW
- Inverter efficiency
- 96 %
- Nominal DC bus
- 480 V DC
- End-of-discharge voltage
- 1.78 V/cell
- Target backup time
- 10 min
- C20 capacity per string
- 130 Ah
- Parallel strings installed
- 3
- Peukert exponent
- 1.2
- Available charger current
- 25 A
- Charge efficiency
- 80 %
Results
- Series cells per string
- 240 cells
- End-of-discharge bus voltage
- 427.2 V
- Inverter DC input
- 187.5 kW
- Bank discharge current at cutoff
- 438.9 A
- Discharge current per installed string
- 146.3 A
- Installed bank capacity at C20
- 390 Ah
- Bank C20 reference current
- 19.5 A
- Minimum modeled C20 bank capacity
- 162.46 Ah
- Parallel strings required for target
- 2 strings
- Modeled autonomy at entered load
- 28.6 min
- Runtime headroom against target
- 18.6 min
- UPS inverter heat
- 7.5 kW
- UPS inverter heat
- 25,591 Btu/h
- Amp-hours withdrawn in modeled discharge
- 209.22 Ah
- Bulk charge time to recover 90% of withdrawn Ah
- 9.41 h
Screening estimate. Confirm against facility and manufacturer data for engineering decisions.