Runtime shortfall on an undersized bank
A future 600 kW UPS load is assessed against a bank of three 120 Ah strings and a 15-minute target.
Engineering schematic
DC battery bus & inverter
Runtime headroom -10.3 min
Inputs
Calculation details
| Measure | Value |
|---|---|
| Series cells per string | 240 cells |
| End-of-discharge bus voltage | 420 V |
| Inverter DC input | 638.3 kW |
| Bank discharge current at cutoff | 1,519.76 A |
| Discharge current per installed string | 506.59 A |
| Installed bank capacity at C20 | 360 Ah |
| Bank C20 reference current | 18 A |
| Minimum modeled C20 bank capacity | 912.71 Ah |
| Parallel strings required for target | 8 strings |
| Modeled autonomy at entered load | 4.69 min |
| Runtime headroom against target | -10.31 min |
| UPS inverter heat | 38.3 kW |
| UPS inverter heat | 130,678 Btu/h |
| Amp-hours withdrawn in modeled discharge | 118.76 Ah |
| Bulk charge time to recover 90% of withdrawn Ah | 1.01 h |
Update the highlighted inputs to see the results.
Starting calculation
- Multiply 240 cells by 1.75 V to get 420 V at cutoff. The inverter draws 1,519.76 A DC at this voltage.
- Apply Peukert’s exponent to 360 Ah of C20 capacity. The model gives 4.69 minutes and requires 8 strings for the target.
A negative runtime margin is the modeled time shortfall at the selected load and cutoff voltage.
Calculation method
- Idc = IT kW × 1,000 ÷ (ηinv × cell count × Vcutoff)
- Peukert hours = 20 × [(bank C20 ÷ 20) ÷ Idc]ᵏ
- Charge recovery hours = 0.90 × Ah withdrawn ÷ (charger A × charge efficiency)
The nominal 480 V or 540 V bus uses 240 or 270 nominal 2 V cells in series per string. Current is held at the calculated end-of-discharge value. Runtime is capped at the nominal amp-hour limit at low current. Recharge assumes a constant available charger current during bulk charge.
Engineering limits
Use vendor constant-power discharge tables, temperature and aging corrections, and the full duty cycle for IEEE 485 sizing. The estimate covers lead-acid batteries. Recovery time refers to amp-hours withdrawn in the modeled discharge, with charger taper and float omitted.
Related worked examples
DataCenterPUELab · Calculation sheet
Runtime shortfall on an undersized bank
Runtime headroom -10.3 min
Inputs
- IT load on UPS
- 600 kW
- Inverter efficiency
- 94 %
- Nominal DC bus
- 480 V DC
- End-of-discharge voltage
- 1.75 V/cell
- Target backup time
- 15 min
- C20 capacity per string
- 120 Ah
- Parallel strings installed
- 3
- Peukert exponent
- 1.25
- Available charger current
- 125 A
- Charge efficiency
- 85 %
Results
- Series cells per string
- 240 cells
- End-of-discharge bus voltage
- 420 V
- Inverter DC input
- 638.3 kW
- Bank discharge current at cutoff
- 1,519.76 A
- Discharge current per installed string
- 506.59 A
- Installed bank capacity at C20
- 360 Ah
- Bank C20 reference current
- 18 A
- Minimum modeled C20 bank capacity
- 912.71 Ah
- Parallel strings required for target
- 8 strings
- Modeled autonomy at entered load
- 4.69 min
- Runtime headroom against target
- -10.31 min
- UPS inverter heat
- 38.3 kW
- UPS inverter heat
- 130,678 Btu/h
- Amp-hours withdrawn in modeled discharge
- 118.76 Ah
- Bulk charge time to recover 90% of withdrawn Ah
- 1.01 h