Baseline reading
Setup losses take 40 ideal parts of capacity, four times the unplanned stop loss. This example uses one representative standard across the mix.
What to test
For a live mixed-model report, sum each model’s ideal time by its actual counts. If rejects cluster by model, apply each model’s ideal time to good parts as well.
Worksheet inputs
Inputs
Results
- Overall equipment effectiveness
- 76.4286%
- Total effective equipment performance
- 22.2917%
- Availability
- 88.0952%
- Performance
- 89.1892%
- Quality
- 97.2727%
- Calendar utilization
- 29.1667%
- Run time
- 370 min
- First-pass good parts
- 321
- Ideal planned output
- 420 units
- Lost to downtime
- 50 units
- Lost to slow cycles and minor stops
- 40 units
- Lost to scrap or rework
- 9 units
- Unplanned stop loss
- 10 units
- Setup and adjustment loss
- 40 units
- Minor-stop loss
- 15 units
- Reduced-speed loss
- 25 units
- Production rejects
- 6
- Startup rejects
- 3
Model notes
Count each first-pass reject once. Use the ideal rate for the product being run and reconcile shift counts against the same production window.
The waterfall translates time losses into good-unit equivalents. Once stops and speed losses are removed, each rejected part reduces first-pass good output by one unit.
Frequently asked questions
Why might one average assembly cycle misstate mixed-model results?
A change in the proportion of long-cycle models can change ideal productive time even with identical equipment and operator performance.
Can tester hold time be recorded as an assembly stoppage?
Capture holds as availability loss if the scheduled line is stopped. If upstream production continues, use the measured constraint boundary and avoid counting the same loss twice.