FactoryOEELab

Worked example · Shop costing

CNC turning quote with shared labor

Cost a short turning job while one operator tends two machines across the planned billable window.

Hourly rate = Annual burden ÷ Billable hours + Allocated labor

Baseline reading

The machine portion is 20 per hour and allocated labor is 24. The resulting 66 setup charge is spread over ten saleable parts.

What to test

Compare staffed setup with unattended running before finalizing the labor ratio. Reconcile whether a separate setup labor rate is required by your costing method.

Currency labels entered amounts. Exports record the selected display units.

Inputs

Machine and billable capacity
$
yr
hr/yr
%
Annual burden and direct labor
$/yr
$/yr
$/yr
$/yr
$/hr
Batch quote
min
min
$
%
%

Results

All-in machine hourly rate
$44.00/hr
Total unit cost
$14.51
Quoted price per unit
$18.14
Batch quantity versus unit cost
Batch quantity versus unit cost Unit cost declines as the fixed setup is spread across more saleable units. The current batch is marked in ochre. UNIT COST / QUANTITY ON LOG SCALE$6.5$9.6$12.6$15.710502501KCurrent 10 pcs • $14.5/pc
Unit cost by batch
10 units$14.51
50 units$9.23
250 units$8.18
1,000 units$7.98
Total batch quote
$181.41
Setup amortized per unit
$6.60
Run cost per saleable unit
$1.85
Material per saleable unit
$6.06
Setup cost per batch
$66.00
Billable hours per year
3,000 hr
Equipment burden rate
$20.00/hr
Allocated operator rate
$24.00/hr

Model notes

The model uses straight-line depreciation with zero residual value and allocates annual machine costs over billable hours. Operator cost is spread over the stated machines per operator.

Run labor, machine time, and material are divided by yield. Setup is spread over the requested saleable quantity. Markup is applied to cost before taxes, freight, and selling adjustments.

View the equations

Frequently asked questions

Can the turning batch use two-machine staffing during setup?

Use the ratio that reflects expected attendance. If setup requires exclusive attention, price that interval separately under the plant’s accepted method.

How can bar-remnant cost be captured in a turned part quote?

Include a material allowance per started part if remnants are a routine process loss. Keep the scrap input for starts that fail to become saleable parts.