Worked example · Shop costing
Wire EDM scrap-adjusted run cost
Spread wire EDM run cost over a 96% saleable yield and compare how the loss affects material and labor.
Hourly rate = Annual burden ÷ Billable hours + Allocated labor
Baseline reading
At 30 per hour and ten minutes per start, run cost is 5.00 before scrap. A 96% yield raises expected run cost per saleable piece to about 5.21.
What to test
Use actual stage of failure to confirm the full-cycle scrap assumption. A defect caught during setup can consume a different mix of material and machine time.
Worksheet inputs
Inputs
Results
- All-in machine hourly rate
- $30.00/hr
- Total unit cost
- $15.93
- Quoted price per unit
- $19.11
| 10 units | $18.63 |
|---|---|
| 50 units | $16.23 |
| 250 units | $15.75 |
| 1,000 units | $15.66 |
- Total batch quote
- $1,911.00
- Setup amortized per unit
- $0.30
- Run cost per saleable unit
- $5.21
- Material per saleable unit
- $10.42
- Setup cost per batch
- $30.00
- Billable hours per year
- 1,500 hr
- Equipment burden rate
- $10.00/hr
- Allocated operator rate
- $20.00/hr
Model notes
The model uses straight-line depreciation with zero residual value and allocates annual machine costs over billable hours. Operator cost is spread over the stated machines per operator.
Run labor, machine time, and material are divided by yield. Setup is spread over the requested saleable quantity. Markup is applied to cost before taxes, freight, and selling adjustments.
Frequently asked questions
Where can EDM wire consumption be entered?
Budget recurring wire in annual tooling or include a separate per-start cost in the local cost estimate. Avoid charging the same wire in both places.
Should a wire-break restart count as both lower yield and extra cycle time?
Log a longer cycle when the part is completed. Use the scrap rate when the start cannot be sold, with an accounting adjustment if the loss happens early.