FactoryOEELab

Worked example · Shop costing

Single-piece prototype quote

Quote a one-piece prototype and see how a full one-off setup changes the break between one part and ten.

Hourly rate = Annual burden ÷ Billable hours + Allocated labor

Baseline reading

The single part uses 30 of setup, 10 of cycle cost, and 15 of material. A 40% markup on the 55 unit cost gives a quote of 77.

What to test

Confirm how engineering and programming hours are billed for a new revision. Record them as a distinct charge when your plant requires it.

Currency labels entered amounts. Exports record the selected display units.

Inputs

Machine and billable capacity
$
yr
hr/yr
%
Annual burden and direct labor
$/yr
$/yr
$/yr
$/yr
$/hr
Batch quote
min
min
$
%
%

Results

All-in machine hourly rate
$60.00/hr
Total unit cost
$55.00
Quoted price per unit
$77.00
Batch quantity versus unit cost
Batch quantity versus unit cost Unit cost declines as the fixed setup is spread across more saleable units. The current batch is marked in ochre. UNIT COST / QUANTITY ON LOG SCALE$20.5$33.5$46.4$59.4110502501KCurrent 1 pcs • $55/pc
Unit cost by batch
10 units$28.00
50 units$25.60
250 units$25.12
1,000 units$25.03
Total batch quote
$77.00
Setup amortized per unit
$30.00
Run cost per saleable unit
$10.00
Material per saleable unit
$15.00
Setup cost per batch
$30.00
Billable hours per year
1,000 hr
Equipment burden rate
$15.00/hr
Allocated operator rate
$45.00/hr

Model notes

The model uses straight-line depreciation with zero residual value and allocates annual machine costs over billable hours. Operator cost is spread over the stated machines per operator.

Run labor, machine time, and material are divided by yield. Setup is spread over the requested saleable quantity. Markup is applied to cost before taxes, freight, and selling adjustments.

View the equations

Frequently asked questions

Why does the prototype cost curve fall steeply near one piece?

The setup is a fixed batch cost, so moving from one to a few parts spreads it quickly. Run and material remain variable per saleable part.

Can prototype inspection certificates be absorbed into markup?

Apply your quotation policy. Include a separately identified charge when the inspection work consumes identifiable time or outside services.