FactoryOEELab

Worked example · Shop costing

Surface grinding batch price breaks

Compare grinding unit costs at 10, 50, 250, and 1,000 pieces under one wheel-dress setup.

Hourly rate = Annual burden ÷ Billable hours + Allocated labor

Baseline reading

The 43 hourly rate makes a 45-minute setup cost 32.25. Setup contributes about 0.13 per saleable part at 250 pieces.

What to test

Check wheel redress and inspection intervals at 1,000 pieces. A larger batch can have additional setups outside this single-setup curve.

Currency labels entered amounts. Exports record the selected display units.

Inputs

Machine and billable capacity
$
yr
hr/yr
%
Annual burden and direct labor
$/yr
$/yr
$/yr
$/yr
$/hr
Batch quote
min
min
$
%
%

Results

All-in machine hourly rate
$43.00/hr
Total unit cost
$4.13
Quoted price per unit
$5.03
Batch quantity versus unit cost
Batch quantity versus unit cost Unit cost declines as the fixed setup is spread across more saleable units. The current batch is marked in ochre. UNIT COST / QUANTITY ON LOG SCALE$3.3$4.8$6.3$7.810502501KCurrent 250 pcs • $4.1/pc
Unit cost by batch
10 units$7.22
50 units$4.64
250 units$4.13
1,000 units$4.03
Total batch quote
$1,258.25
Setup amortized per unit
$0.13
Run cost per saleable unit
$0.77
Material per saleable unit
$3.23
Setup cost per batch
$32.25
Billable hours per year
1,800 hr
Equipment burden rate
$13.00/hr
Allocated operator rate
$30.00/hr

Model notes

The model uses straight-line depreciation with zero residual value and allocates annual machine costs over billable hours. Operator cost is spread over the stated machines per operator.

Run labor, machine time, and material are divided by yield. Setup is spread over the requested saleable quantity. Markup is applied to cost before taxes, freight, and selling adjustments.

View the equations

Frequently asked questions

How should normal grinding wheel dress intervals be modeled?

Include recurring redress allowance in the effective cycle or annual tooling. Put a one-time dress or fixture setup in batch setup.

Why is the 1,000-piece grinding unit cost still greater than material cost?

Reducing setup per part leaves machine cycle, labor, yield, and material in the variable cost.