Reach in each direction is (Lmax − fixed loss − reserve) / α. The usable reach is the smaller result, capped at the entered route limit and subject to both physical loss floors.
B+ and C+ follow the G.984.2/G.9807.1 class-window convention. N1 and N2 use the G.9807.1 basic wavelength set. C++ is a vendor profile. PX20 uses the EPON planning window. The TX/RX entries are editable presets and the route cap represents an entered equipment limit. Verify wavelength plans, splitters, differential reach and equipment interoperability separately.
Pass. Both directions meet the ODN loss window and entered route cap.
Inputs
PON optics class
PX20 · EPON
Feeder length
11 km
Drop length
1 km
Design reserve
2 dB
Port ratio
1:16
Excess loss
0.9 dB
Port ratio
Bypass
Port ratio
Bypass
Mated connector pairs
2
Loss per pair
0.4 dB
Splices
4
Loss per splice
0.1 dB
ODN minimum loss
10 dB
ODN maximum loss
24 dB
Maximum route length
20 km
OLT minimum launch
2 dBm
OLT maximum launch
7 dBm
ONU sensitivity
-24 dBm
ONU overload
-3 dBm
Downstream attenuation
0.25 dB/km
ONU minimum launch
0.5 dBm
ONU maximum launch
4 dBm
OLT sensitivity
-27 dBm
OLT overload
-6 dBm
Upstream attenuation
0.35 dB/km
Results
Cascaded splitter loss
12.941 dB
Fixed loss before fiber
14.141 dB
Feeder + drop
12 km
Maximum usable reach
20 km
Minimum span without added loss
0 km
Added attenuation to satisfy loss floors
0 dB
TX-to-sensitivity budget
26 dB
Allowed physical loss window
10 to 24 dB
Predicted ODN loss
17.141 dB
Low to high receive power
-15.141 to -10.141 dBm
Margin after reserve
4.859 dB
Space below overload
7.141 dB
TX-to-sensitivity budget
27.5 dB
Allowed physical loss window
10 to 24 dB
Predicted ODN loss
18.341 dB
Low to high receive power
-17.841 to -14.341 dBm
Margin after reserve
3.659 dB
Space below overload
8.341 dB
Stage 1 · 6.25% port
12.941 dB
Stage 2
Bypassed
Stage 3
Bypassed