Reach in each direction is (Lmax − fixed loss − reserve) / α. The usable reach is the smaller result, capped at the entered route limit and subject to both physical loss floors.
B+ and C+ follow the G.984.2/G.9807.1 class-window convention. N1 and N2 use the G.9807.1 basic wavelength set. C++ is a vendor profile. PX20 uses the EPON planning window. The TX/RX entries are editable presets and the route cap represents an entered equipment limit. Verify wavelength plans, splitters, differential reach and equipment interoperability separately.
Pass. Both directions meet the ODN loss window and entered route cap.
Inputs
PON optics class
C++ · vendor GPON
Feeder length
14 km
Drop length
3 km
Design reserve
2 dB
Port ratio
1:4
Excess loss
0.7 dB
Port ratio
1:16
Excess loss
1.5 dB
Port ratio
Bypass
Mated connector pairs
5
Loss per pair
0.4 dB
Splices
4
Loss per splice
0.1 dB
ODN minimum loss
20 dB
ODN maximum loss
35 dB
Maximum route length
20 km
OLT minimum launch
5 dBm
OLT maximum launch
9 dBm
ONU sensitivity
-30 dBm
ONU overload
-8 dBm
Downstream attenuation
0.25 dB/km
ONU minimum launch
0.5 dBm
ONU maximum launch
5 dBm
OLT sensitivity
-35 dBm
OLT overload
-15 dBm
Upstream attenuation
0.35 dB/km
Results
Cascaded splitter loss
20.262 dB
Fixed loss before fiber
22.662 dB
Feeder + drop
17 km
Maximum usable reach
20 km
Minimum span without added loss
0 km
Added attenuation to satisfy loss floors
0 dB
TX-to-sensitivity budget
35 dB
Allowed physical loss window
20 to 35 dB
Predicted ODN loss
26.912 dB
Low to high receive power
-21.912 to -17.912 dBm
Margin after reserve
6.088 dB
Space below overload
9.912 dB
TX-to-sensitivity budget
35.5 dB
Allowed physical loss window
20 to 35 dB
Predicted ODN loss
28.612 dB
Low to high receive power
-28.112 to -23.612 dBm
Margin after reserve
4.388 dB
Space below overload
8.612 dB
Stage 1 · 25% port
6.721 dB
Stage 2 · 6.25% port
13.541 dB
Stage 3
Bypassed
Follow IEC 60825-2 and ANSI Z136.2 procedures. Never inspect an energized fiber or connector with your eye or an optical magnifier. Verify the installed link with a calibrated power meter and field OTDR at the relevant wavelengths, using appropriate launch and receive fibers and a safe test setup.
Correct the inputs to print an engineering report.