GPON C+ with a 1:64 split

Check a longer branch with a high fan-out and an extra patch field.

Inputs

Pick an optics class to fill in typical planning values, then check the actual OLT and ONU specifications. For tap stages, enter the percentage on the path being tested.

Optics and cable
km
km
dB
Splitter stage 1
dB
Splitter stage 2
Splitter stage 3
Plant and class limits
dB
dB
dB
dB
km
Downstream · OLT to ONU
dBm
dBm
dBm
dBm
dB/km
Upstream · ONU to OLT
dBm
dBm
dBm
dBm
dB/km
LIVE ANATOMY

OLT to ONU branch budget

OLT to ONU branch budgetSPLIT LOSS19.662dBDOWN MARGIN2.163dBUP MARGIN0.213dBMAX REACH20kmFeeder 17 kmDrop 2.5 kmOLTONU1:6419.66 dBBypassBypassTX low3 dBmRX low-24.34 dBmLIMITING POWER MARGIN0 dB32 dB limit0.21 dB left
PassBoth directions meet the ODN loss window and entered route cap.

Branch limits

Cascaded splitter loss
19.662 dB
Fixed loss before fiber
22.462 dB
Feeder + drop
19.5 km
Maximum usable reach
20 km
Minimum span without added loss
0 km
Added attenuation to satisfy loss floors
0 dB

Downstream · OLT to ONU

TX-to-sensitivity budget
33 dB
Allowed physical loss window
17 to 32 dB
Predicted ODN loss
27.337 dB
Low to high receive power
-24.337 to -20.337 dBm
Margin after reserve
2.163 dB
Space below overload
12.337 dB

Upstream · ONU to OLT

TX-to-sensitivity budget
32.5 dB
Allowed physical loss window
17 to 32 dB
Predicted ODN loss
29.287 dB
Low to high receive power
-28.787 to -24.287 dBm
Margin after reserve
0.213 dB
Space below overload
12.287 dB

Selected splitter ports

Stage 1 · 1.563% port
19.662 dB
Stage 2
Bypassed
Stage 3
Bypassed

What to check

C+ adds allowable path loss and raises the required minimum physical loss.

Open the general pon splitter budget calculator

Formulas and assumptions

Balanced and unbalanced splits

Lstage = −10 log₁₀(port fraction) + excess loss

Use 1/N for an equal 1:N stage or the selected percentage divided by 100 for a tap. Add losses along just the chosen branch.

Low and high received power

RXlow = TXmin − Lpath; RXhigh = TXmax − Lpath

Use separate cable attenuation in each direction. The highest receive power is compared with the overload ceiling.

ODN window and reach

Lmax = min(class max, TXmin − RX sensitivity); Lmin = max(class min, TXmax − RX overload)

Reach in each direction is (Lmax − fixed loss − reserve) / α. The usable reach is the smaller result, capped at the entered route limit and subject to both physical loss floors.

B+ and C+ follow the G.984.2/G.9807.1 class-window convention. N1 and N2 use the G.9807.1 basic wavelength set. C++ is a vendor profile. PX20 uses the EPON planning window. The TX/RX entries are editable presets and the route cap represents an entered equipment limit. Verify wavelength plans, splitters, differential reach and equipment interoperability separately.

Worked examples

Open a scenario and edit any parameter.