Reach in each direction is (Lmax − fixed loss − reserve) / α. The usable reach is the smaller result, capped at the entered route limit and subject to both physical loss floors.
B+ and C+ follow the G.984.2/G.9807.1 class-window convention. N1 and N2 use the G.9807.1 basic wavelength set. C++ is a vendor profile. PX20 uses the EPON planning window. The TX/RX entries are editable presets and the route cap represents an entered equipment limit. Verify wavelength plans, splitters, differential reach and equipment interoperability separately.
Pass. Both directions meet the ODN loss window and entered route cap.
Inputs
PON optics class
C+ · GPON
Feeder length
17 km
Drop length
2.5 km
Design reserve
2.5 dB
Port ratio
1:64
Excess loss
1.6 dB
Port ratio
Bypass
Port ratio
Bypass
Mated connector pairs
6
Loss per pair
0.4 dB
Splices
4
Loss per splice
0.1 dB
ODN minimum loss
17 dB
ODN maximum loss
32 dB
Maximum route length
20 km
OLT minimum launch
3 dBm
OLT maximum launch
7 dBm
ONU sensitivity
-30 dBm
ONU overload
-8 dBm
Downstream attenuation
0.25 dB/km
ONU minimum launch
0.5 dBm
ONU maximum launch
5 dBm
OLT sensitivity
-32 dBm
OLT overload
-12 dBm
Upstream attenuation
0.35 dB/km
Results
Cascaded splitter loss
19.662 dB
Fixed loss before fiber
22.462 dB
Feeder + drop
19.5 km
Maximum usable reach
20 km
Minimum span without added loss
0 km
Added attenuation to satisfy loss floors
0 dB
TX-to-sensitivity budget
33 dB
Allowed physical loss window
17 to 32 dB
Predicted ODN loss
27.337 dB
Low to high receive power
-24.337 to -20.337 dBm
Margin after reserve
2.163 dB
Space below overload
12.337 dB
TX-to-sensitivity budget
32.5 dB
Allowed physical loss window
17 to 32 dB
Predicted ODN loss
29.287 dB
Low to high receive power
-28.787 to -24.287 dBm
Margin after reserve
0.213 dB
Space below overload
12.287 dB
Stage 1 · 1.563% port
19.662 dB
Stage 2
Bypassed
Stage 3
Bypassed
Follow IEC 60825-2 and ANSI Z136.2 procedures. Never inspect an energized fiber or connector with your eye or an optical magnifier. Verify the installed link with a calibrated power meter and field OTDR at the relevant wavelengths, using appropriate launch and receive fibers and a safe test setup.
Correct the inputs to print an engineering report.