Aluminum clamp stack

A steel screw clamps two aluminum members of equal effective length.

Input units
Load fraction 0.3724
Bolt tension 22,075 N
Clamp force 12,475 N
Separation 29,477 N

Anatomy

Bolt extension and clamp release

Edit inputs
Bolt extension and clamp releaseSchematic view with the current loads and dimensions. JOINT SECTIONJOINT FORCEExternal pull PAxial displacementPreload Fᵢ18,500 NBolt Fᵦ22,080 NClamp Fₘ12,480 N

Screening margins

Within screen
  • Separation9,600 N / 29,480 N
    Within screen
  • Bolt proof load22,080 N / 30,380 N
    Within screen
  • Goodman fatigue81.67% of limit
    Within screen

Calculated values

Bolt load fraction C0.3724
Peak bolt tension Fᵦ22,075 N
Remaining clamp Fₘ12,475 N
External separation load Pₛₑₚ29,477 N
Tensile stress area Aₜ36.6 mm²
Bolt proof strength Sₚ830 MPa
Axial bolt stiffness kᵦ317,680 N/mm
Axial member stiffness kₘ535,390 N/mm
Linear clamp reserve12,475 N
Bolt proof load30,378 N
Separation factor n₀3.0706 ×
Proof factor nₚ1.3761 ×
Cycle mean tensile stress558.37 MPa
Alternating tensile stress44.769 MPa
Nominal Goodman factor1.2244 ×

Starting result

Reducing member modulus lowers clamp stiffness and increases the bolt’s share of the applied load.

Axial member stiffness kₘ
535,390 N/mm
Bolt load fraction C
0.3724
Alternating tensile stress
44.769 MPa

Model and assumptions

C = kᵦ/(kᵦ+kₘ) · Fᵦ = Fᵢ+CP · Fₘ = Fᵢ−(1−C)P before separation

Centered axial tension with unit load introduction. The estimate uses bolt thread and shank compliance and two symmetric 30° member frusta. After separation the bolt carries the full load and retained clamp is zero.

References and calculation method

Worked examples

Open the standard calculator