Joint driven beyond separation

A centered tensile proof pull opens a preloaded joint well before the peak external load.

Input units
Load fraction 0.2
Bolt tension 42,000 N
Clamp force 0 N
Separation 32,500 N

Anatomy

Bolt extension and clamp release

Edit inputs
Bolt extension and clamp releaseSchematic view with the current loads and dimensions. JOINT SECTIONJOINT FORCEExternal pull PAxial displacementPreload Fᵢ26,000 NBolt Fᵦ42,000 NClamp Fₘ0 N

Screening margins

Exceeds screen
  • Separation42,000 N / 32,500 N
    Exceeds screen
  • Bolt proof load42,000 N / 69,970 N
    Within screen

Calculated values

Bolt load fraction C0.2
Peak bolt tension Fᵦ42,000 N
Remaining clamp Fₘ0 N
External separation load Pₛₑₚ32,500 N
Tensile stress area Aₜ84.3 mm²
Bolt proof strength Sₚ830 MPa
Axial bolt stiffness kᵦ500,000 N/mm
Axial member stiffness kₘ2e6 N/mm
Linear clamp reserve-7,600 N
Bolt proof load69,969 N
Separation factor n₀0.77381 ×
Proof factor nₚ1.6659 ×
Cycle mean tensile stress—
Alternating tensile stress—
Nominal Goodman factor—

Starting result

The clamp reserve becomes negative in the linear model. Physical clamp is zero, and the bolt carries the full peak load.

External separation load Pₛₑₚ
32,500 N
Linear clamp reserve
-7,600 N
Peak bolt tension Fᵦ
42,000 N

Model and assumptions

C = kᵦ/(kᵦ+kₘ) · Fᵦ = Fᵢ+CP · Fₘ = Fᵢ−(1−C)P before separation

Centered axial tension with unit load introduction. The estimate uses bolt thread and shank compliance and two symmetric 30° member frusta. After separation the bolt carries the full load and retained clamp is zero.

References and calculation method

Worked examples

Open the standard calculator