Two turnovers double the flow volume compared with a one-turnover schedule. This example compares costs for the same 48,000 daily gallons across both speeds.
24,000 US gal ÷ 72 US gpm ÷ 60 × 2 = 11.11 hr/day at baseline speed.
2,600 ÷ 3,450 = 0.7536 speed ratio. Multiply flow by the ratio and power by the ratio cubed to get 770.4 W.
For 30 days and equivalent circulation, electricity is 600 kWh baseline vs. 340.77 kWh variable speed. At $0.21/kWh the difference is $54.44.
The affinity-law estimate pairs equal daily circulation volumes and assumes the same hydraulic system. Confirm actual flow and watts at each speed, plus the equipment’s minimum flow.
A turnover means a water volume equal to the pool passed through the pump. Actual mixing, sanitation, skimming and equipment run times determine the operating schedule.
Common questions
How does the 72 gpm estimate change as the filter loads?
Resistance can rise as a filter gets dirty. Measure flow with the system in the condition you actually want to model.
Can I split the two-turnover schedule into separate blocks?
At the same flow and speed, the total runtime can be divided if equipment minimum runs, priming and the controller allow it.
24,000 US gal ÷ 72 US gpm ÷ 60 × 2 = 11.11 hr/day at baseline speed.
2,600 ÷ 3,450 = 0.7536 speed ratio. Multiply flow by the ratio and power by the ratio cubed to get 770.4 W.
For 30 days and equivalent circulation, electricity is 600 kWh baseline vs. 340.77 kWh variable speed. At $0.21/kWh the difference is $54.44.
Verify pump flow, pressure and operating limits from the equipment documentation. Use a water test kit to check sanitizer and pH independently of estimated turnover. Read the product label, wear the required protection and keep swimmers out during treatment. Never mix pool chemicals or chlorine types, and never add acid and chlorine together. Verify readings with a pool or spa test kit before adding chemicals and retest after circulation and before use.