Worked example

When 1,200 RPM Cannot Fit Two Turnovers Into One Day

The reduced flow makes the modeled hours exceed one day. The cost chart can still compare the math, while the warning identifies the infeasible schedule.

Jump to results

Example readings

Pool and baseline pump
US gal
US gpm
rpm
W
Variable-speed comparison
rpm
days
USD/kWh

Results

Estimate

Monthly electricity saved
896.6 kWh
Monthly cost difference
161.39 USD
Variable-speed runtime
57.5 hr/day
Estimated variable-speed draw
72 W
Estimated variable-speed flow
17.4 US gpm
Baseline runtime
20 hr/day
Baseline monthly cost
183.6 USD
Variable-speed monthly cost
22.21 USD
Monthly cost by pump speed
MONTHLY COST$0 RPM3,864 RPMBaseline $183.61,200 RPM: $22.21
Daily turnover runtime comparison
Turnovers per dayBaselineVariable speed
1×10 hr28.75 hr
1.5×15 hr43.13 hr
2×20 hr57.5 hr

Export & share

Worked calculation

  1. 30,000 US gal ÷ 50 US gpm ÷ 60 × 2 = 20 hr/day at baseline speed.
  2. 1,200 ÷ 3,450 = 0.3478 speed ratio. Multiply flow by the ratio and power by the ratio cubed to get 71.5 W.
  3. For 30 days and equivalent circulation, electricity is 1,020 kWh baseline vs. 123.4 kWh variable speed. At $0.18/kWh the difference is $161.39.
  • The affinity-law estimate pairs equal daily circulation volumes and assumes the same hydraulic system. Confirm actual flow and watts at each speed, plus the equipment’s minimum flow.
  • A turnover means a water volume equal to the pool passed through the pump. Actual mixing, sanitation, skimming and equipment run times determine the operating schedule.
  • At least one runtime exceeds 24 hours per day. Its energy and cost are theoretical because the requested turnover does not fit in one day.

Common questions

What should I change when the candidate runtime is greater than 24 hours?

Check the measured flow and equipment schedule. A higher candidate speed or a different equipment-approved circulation goal may fit.

Can a very low RPM fail even if the turnover fits?

Yes. Heaters, salt cells and filtration can have minimum flow requirements. Verify those and the pump manual before scheduling.

Method and safety references