Worked example · Hydrology
Meadow runoff during a deep design storm
An existing meadow and adjoining woodland drain from a moderate-size watershed. Enter the same curve number before and after to study a baseline event.
Inputs
Rainfall partition
Live resultsRunoff is unchanged
The volume change is post-development minus pre-development.
Calculation results
- Post runoff
- 3.07 in
- Pre runoff
- 3.07 in
- Volume change
- 0 acre-ft
- Post CN
- 66.3
- Pre-development CN
- 66.3
- Drainage area
- 49 acre
- Pre retention
- 5.09 in
- Post retention
- 5.09 in
- Pre initial abstraction
- 1.02 in
- Post initial abstraction
- 1.02 in
- Pre runoff volume
- 12.555 acre-ft
- Post runoff volume
- 12.555 acre-ft
- Runoff depth change
- 0 in
Worked calculation
The depth and volume deltas should equal zero. Change the rainfall to see how the runoff fraction increases with storm depth.
S = 1000/CN − 10 (inches) · Iₐ = λS · Qd = (P − Iₐ)²/(P − Iₐ + S) for P > Iₐ, else 0.
The 0.20 option follows TR-55. The 0.05 option evaluates the entered CN values as supplied. For design with 0.05, use curve numbers calibrated to that choice. Weighted CN is evaluated before the nonlinear runoff equation. For strongly mixed or hydraulically disconnected cover, consider separate runoff calculations.
More worked examples
Open the main calculatorMeadow runoff during a deep design storm
Inputs
- Zone 1 area
- 31 acre
- Zone 1 pre-development CN
- 69
- Zone 1 post-development CN
- 69
- Zone 2 area
- 14 acre
- Zone 2 pre-development CN
- 58
- Zone 2 post-development CN
- 58
- Zone 3 area
- 4 acre
- Zone 3 pre-development CN
- 74
- Zone 3 post-development CN
- 74
- Event rainfall
- 6.8 in
- Initial abstraction
- 0.20 S · TR-55
Results
- Post runoff
- 3.07 in
- Pre runoff
- 3.07 in
- Volume change
- 0 acre-ft
- Post CN
- 66.3
- Pre-development CN
- 66.3
- Drainage area
- 49 acre
- Pre retention
- 5.09 in
- Post retention
- 5.09 in
- Pre initial abstraction
- 1.02 in
- Post initial abstraction
- 1.02 in
- Pre runoff volume
- 12.555 acre-ft
- Post runoff volume
- 12.555 acre-ft
- Runoff depth change
- 0 in
Runoff is unchanged
The volume change is post-development minus pre-development.
S = 1000/CN − 10 (inches) · Iₐ = λS · Qd = (P − Iₐ)²/(P − Iₐ + S) for P > Iₐ, else 0.
Screening worksheet · Verify design using project criteria and site data.