Worked example · Hydrology

Subdivision runoff before and after buildout

A three-zone subdivision replaces meadow with streets and lots while preserving a buffer along the stream. Both cases use the same 4.25 in event.

Inputs

Drainage zones
ZoneArea (acre)Pre CNPost CN
Zone 1
0–5,000 acre
30–98
30–98
Zone 2
0–5,000 acre
30–98
30–98
Zone 3
0–5,000 acre
30–98
30–98

Keep each zone footprint the same across both conditions. Subdivide cover where needed and use zero area for unused zones.

Rainfall event
0–60 in

Match the curve numbers to the selected abstraction convention.

Rainfall partition

Live results
Rainfall partition Post-development runoff increases. The volume change is post-development minus pre-development. POST RUNOFF 2.35 in PRE RUNOFF 1.14 in VOLUME CHANGE 1.762 acre-ft POST CN 81.2 Event rain4.25 in1.14 inExisting2.35 inDeveloped 0% · retainedPost runoff share100% · runoff

Post-development runoff increases

The volume change is post-development minus pre-development.

Calculation results

Post runoff
2.35 in
Pre runoff
1.14 in
Volume change
1.762 acre-ft
Post CN
81.2
Pre-development CN
64.3
Drainage area
17.4 acre
Pre retention
5.55 in
Post retention
2.31 in
Pre initial abstraction
1.11 in
Post initial abstraction
0.46 in
Pre runoff volume
1.647 acre-ft
Post runoff volume
3.409 acre-ft
Runoff depth change
1.22 in

Worked calculation

Check the pre- and post-development volume difference. Keeping the buffer at the same CN isolates the effect of the developed zones.

S = 1000/CN − 10 (inches) · Iₐ = λS · Qd = (P − Iₐ)²/(P − Iₐ + S) for P > Iₐ, else 0.

The 0.20 option follows TR-55. The 0.05 option evaluates the entered CN values as supplied. For design with 0.05, use curve numbers calibrated to that choice. Weighted CN is evaluated before the nonlinear runoff equation. For strongly mixed or hydraulically disconnected cover, consider separate runoff calculations.

Open the main calculator

Share this calculation

This link opens the worksheet with your current inputs and units.