Worked example · Hydrology
Native cover restoration runoff reduction
Restoration improves cover in two zones and leaves a maintenance strip unchanged. Lower post-development CN values represent the improved cover.
Inputs
Rainfall partition
Live resultsPost-development runoff decreases
The volume change is post-development minus pre-development.
Calculation results
- Post runoff
- 1.06 in
- Pre runoff
- 1.92 in
- Volume change
- -0.895 acre-ft
- Post CN
- 67.7
- Pre-development CN
- 80.6
- Drainage area
- 12.5 acre
- Pre retention
- 2.41 in
- Post retention
- 4.77 in
- Pre initial abstraction
- 0.48 in
- Post initial abstraction
- 0.95 in
- Pre runoff volume
- 2.003 acre-ft
- Post runoff volume
- 1.108 acre-ft
- Runoff depth change
- -0.86 in
Worked calculation
The reported change is negative when the project reduces runoff. Increase the maintenance-strip CN to compare the effect of a smaller restoration.
S = 1000/CN − 10 (inches) · Iₐ = λS · Qd = (P − Iₐ)²/(P − Iₐ + S) for P > Iₐ, else 0.
The 0.20 option follows TR-55. The 0.05 option evaluates the entered CN values as supplied. For design with 0.05, use curve numbers calibrated to that choice. Weighted CN is evaluated before the nonlinear runoff equation. For strongly mixed or hydraulically disconnected cover, consider separate runoff calculations.
More worked examples
Open the main calculatorNative cover restoration runoff reduction
Inputs
- Zone 1 area
- 7.2 acre
- Zone 1 pre-development CN
- 80
- Zone 1 post-development CN
- 62
- Zone 2 area
- 3.5 acre
- Zone 2 pre-development CN
- 78
- Zone 2 post-development CN
- 69
- Zone 3 area
- 1.8 acre
- Zone 3 pre-development CN
- 88
- Zone 3 post-development CN
- 88
- Event rainfall
- 3.8 in
- Initial abstraction
- 0.20 S · TR-55
Results
- Post runoff
- 1.06 in
- Pre runoff
- 1.92 in
- Volume change
- -0.895 acre-ft
- Post CN
- 67.7
- Pre-development CN
- 80.6
- Drainage area
- 12.5 acre
- Pre retention
- 2.41 in
- Post retention
- 4.77 in
- Pre initial abstraction
- 0.48 in
- Post initial abstraction
- 0.95 in
- Pre runoff volume
- 2.003 acre-ft
- Post runoff volume
- 1.108 acre-ft
- Runoff depth change
- -0.86 in
Post-development runoff decreases
The volume change is post-development minus pre-development.
S = 1000/CN − 10 (inches) · Iₐ = λS · Qd = (P − Iₐ)²/(P − Iₐ + S) for P > Iₐ, else 0.
Screening worksheet · Verify design using project criteria and site data.