Worked example · Hydrology
Small storm below initial abstraction
A short, light storm falls on sandy ground and low-density development. It can be entirely retained under the selected initial-abstraction assumption.
Inputs
Rainfall partition
Live resultsNo post-development runoff
Post-development rainfall does not exceed initial abstraction.
Calculation results
- Post runoff
- 0 in
- Pre runoff
- 0 in
- Volume change
- 0 acre-ft
- Post CN
- 47.7
- Pre-development CN
- 37.3
- Drainage area
- 6 acre
- Pre retention
- 16.79 in
- Post retention
- 10.98 in
- Pre initial abstraction
- 3.36 in
- Post initial abstraction
- 2.2 in
- Pre runoff volume
- 0 acre-ft
- Post runoff volume
- 0 acre-ft
- Runoff depth change
- 0 in
Worked calculation
Raise rainfall gradually past the reported post-development initial abstraction to see where direct runoff begins.
S = 1000/CN − 10 (inches) · Iₐ = λS · Qd = (P − Iₐ)²/(P − Iₐ + S) for P > Iₐ, else 0.
The 0.20 option follows TR-55. The 0.05 option evaluates the entered CN values as supplied. For design with 0.05, use curve numbers calibrated to that choice. Weighted CN is evaluated before the nonlinear runoff equation. For strongly mixed or hydraulically disconnected cover, consider separate runoff calculations.
More worked examples
Open the main calculatorSmall storm below initial abstraction
Inputs
- Zone 1 area
- 2 acre
- Zone 1 pre-development CN
- 30
- Zone 1 post-development CN
- 45
- Zone 2 area
- 4 acre
- Zone 2 pre-development CN
- 41
- Zone 2 post-development CN
- 49
- Zone 3 area
- 0 acre
- Zone 3 pre-development CN
- 74
- Zone 3 post-development CN
- 74
- Event rainfall
- 0.6 in
- Initial abstraction
- 0.20 S · TR-55
Results
- Post runoff
- 0 in
- Pre runoff
- 0 in
- Volume change
- 0 acre-ft
- Post CN
- 47.7
- Pre-development CN
- 37.3
- Drainage area
- 6 acre
- Pre retention
- 16.79 in
- Post retention
- 10.98 in
- Pre initial abstraction
- 3.36 in
- Post initial abstraction
- 2.2 in
- Pre runoff volume
- 0 acre-ft
- Post runoff volume
- 0 acre-ft
- Runoff depth change
- 0 in
No post-development runoff
Post-development rainfall does not exceed initial abstraction.
S = 1000/CN − 10 (inches) · Iₐ = λS · Qd = (P − Iₐ)²/(P − Iₐ + S) for P > Iₐ, else 0.
Screening worksheet · Verify design using project criteria and site data.