Worked example · Hydrology

Native cover restoration runoff reduction

Restoration improves cover in two zones and leaves a maintenance strip unchanged. Lower post-development CN values represent the improved cover.

Inputs

Drainage zones
ZoneArea (acre)Pre CNPost CN
Zone 1
0–5,000 acre
30–98
30–98
Zone 2
0–5,000 acre
30–98
30–98
Zone 3
0–5,000 acre
30–98
30–98

Keep each zone footprint the same across both conditions. Subdivide cover where needed and use zero area for unused zones.

Rainfall event
0–60 in

Match the curve numbers to the selected abstraction convention.

Rainfall partition

Live results
Rainfall partition Post-development runoff decreases. The volume change is post-development minus pre-development. POST RUNOFF 1.06 in PRE RUNOFF 1.92 in VOLUME CHANGE -0.895 acre-ft POST CN 67.7 Event rain3.8 in1.92 inExisting1.06 inDeveloped 0% · retainedPost runoff share100% · runoff

Post-development runoff decreases

The volume change is post-development minus pre-development.

Calculation results

Post runoff
1.06 in
Pre runoff
1.92 in
Volume change
-0.895 acre-ft
Post CN
67.7
Pre-development CN
80.6
Drainage area
12.5 acre
Pre retention
2.41 in
Post retention
4.77 in
Pre initial abstraction
0.48 in
Post initial abstraction
0.95 in
Pre runoff volume
2.003 acre-ft
Post runoff volume
1.108 acre-ft
Runoff depth change
-0.86 in

Worked calculation

The reported change is negative when the project reduces runoff. Increase the maintenance-strip CN to compare the effect of a smaller restoration.

S = 1000/CN − 10 (inches) · Iₐ = λS · Qd = (P − Iₐ)²/(P − Iₐ + S) for P > Iₐ, else 0.

The 0.20 option follows TR-55. The 0.05 option evaluates the entered CN values as supplied. For design with 0.05, use curve numbers calibrated to that choice. Weighted CN is evaluated before the nonlinear runoff equation. For strongly mixed or hydraulically disconnected cover, consider separate runoff calculations.

Open the main calculator

Share this calculation

This link opens the worksheet with your current inputs and units.