Worked example · Hydrology
Subdivision runoff before and after buildout
A three-zone subdivision replaces meadow with streets and lots while preserving a buffer along the stream. Both cases use the same 4.25 in event.
Inputs
Rainfall partition
Live resultsPost-development runoff increases
The volume change is post-development minus pre-development.
Calculation results
- Post runoff
- 2.35 in
- Pre runoff
- 1.14 in
- Volume change
- 1.762 acre-ft
- Post CN
- 81.2
- Pre-development CN
- 64.3
- Drainage area
- 17.4 acre
- Pre retention
- 5.55 in
- Post retention
- 2.31 in
- Pre initial abstraction
- 1.11 in
- Post initial abstraction
- 0.46 in
- Pre runoff volume
- 1.647 acre-ft
- Post runoff volume
- 3.409 acre-ft
- Runoff depth change
- 1.22 in
Worked calculation
Check the pre- and post-development volume difference. Keeping the buffer at the same CN isolates the effect of the developed zones.
S = 1000/CN − 10 (inches) · Iₐ = λS · Qd = (P − Iₐ)²/(P − Iₐ + S) for P > Iₐ, else 0.
The 0.20 option follows TR-55. The 0.05 option evaluates the entered CN values as supplied. For design with 0.05, use curve numbers calibrated to that choice. Weighted CN is evaluated before the nonlinear runoff equation. For strongly mixed or hydraulically disconnected cover, consider separate runoff calculations.
More worked examples
Open the main calculatorSubdivision runoff before and after buildout
Inputs
- Zone 1 area
- 4.9 acre
- Zone 1 pre-development CN
- 67
- Zone 1 post-development CN
- 94
- Zone 2 area
- 9.5 acre
- Zone 2 pre-development CN
- 64
- Zone 2 post-development CN
- 81
- Zone 3 area
- 3 acre
- Zone 3 pre-development CN
- 61
- Zone 3 post-development CN
- 61
- Event rainfall
- 4.25 in
- Initial abstraction
- 0.20 S · TR-55
Results
- Post runoff
- 2.35 in
- Pre runoff
- 1.14 in
- Volume change
- 1.762 acre-ft
- Post CN
- 81.2
- Pre-development CN
- 64.3
- Drainage area
- 17.4 acre
- Pre retention
- 5.55 in
- Post retention
- 2.31 in
- Pre initial abstraction
- 1.11 in
- Post initial abstraction
- 0.46 in
- Pre runoff volume
- 1.647 acre-ft
- Post runoff volume
- 3.409 acre-ft
- Runoff depth change
- 1.22 in
Post-development runoff increases
The volume change is post-development minus pre-development.
S = 1000/CN − 10 (inches) · Iₐ = λS · Qd = (P − Iₐ)²/(P − Iₐ + S) for P > Iₐ, else 0.
Screening worksheet · Verify design using project criteria and site data.