Worked example · Conveyance
Curb height exceeded during a larger storm
A relatively short curb borders the gutter near a low sidewalk edge. The design storm exceeds the modeled curb depth.
Inputs
Curb and gutter cutaway
Live resultsWater exceeds curb height
Grate and curb opening are independent capture alternatives.
HEC-22 Equation 7.10 may overstate curb capture for longer openings. Check the FHWA-HRT-22-061 method when the entered or estimated full-capture length reaches 10 ft (3.05 m).
Calculation results
- Spread
- 17.88 ft
- Curb depth
- 0.572 ft
- Grate capture
- 8.41 cfs
- Curb capture
- 8.61 cfs
- Approach velocity
- 3.52 ft/s
- Frontal flow Eₒ
- 31.9 %
- Grate efficiency
- 46.7 %
- Curb efficiency
- 47.8 %
- Grate bypass flow
- 9.59 cfs
- Curb bypass flow
- 9.39 cfs
- Curb length for full capture
- 39.58 ft
- Spread reserve
- -4.88 ft
- Curb height reserve
- -0.239 ft
Worked calculation
The nominal triangular spread still describes the screening equation. Once water crosses the curb, model that flow path separately.
Q = (Kᵤ/n) Sₓ⁵ᐟ³ Sₗ¹ᐟ² T⁸ᐟ³ · d = TSₓ · Eₒ = 1 − (1 − min(W/T, 1))⁸ᐟ³.
Uniform triangular pavement and separate on-grade inlet alternatives. Spread above the curb is outside this model, as are sag flow, depressed gutters, debris, clogging and surcharge. Curb capture uses HEC-22 Equations 7.10 and 7.13. Equation 7.10 can underestimate the required opening length, especially for openings of 10 ft (3.05 m) or more. See FHWA-HRT-22-061 for the alternative method. Results use the published US coefficients and convert to SI.
More worked examples
Open the main calculatorCurb height exceeded during a larger storm
Inputs
- Approach flow Q
- 18 cfs
- Longitudinal grade
- 0.6 %
- Pavement cross slope
- 3.2 %
- Manning n
- 0.017
- Allowable spread
- 13 ft
- Curb height
- 4 in
- Grate width
- 2.4 ft
- Grate length
- 3 ft
- Grate splash-over Vₒ
- 5.5 ft/s
- Curb opening length
- 12 ft
Results
- Spread
- 17.88 ft
- Curb depth
- 0.572 ft
- Grate capture
- 8.41 cfs
- Curb capture
- 8.61 cfs
- Approach velocity
- 3.52 ft/s
- Frontal flow Eₒ
- 31.9 %
- Grate efficiency
- 46.7 %
- Curb efficiency
- 47.8 %
- Grate bypass flow
- 9.59 cfs
- Curb bypass flow
- 9.39 cfs
- Curb length for full capture
- 39.58 ft
- Spread reserve
- -4.88 ft
- Curb height reserve
- -0.239 ft
Water exceeds curb height
Grate and curb opening are independent capture alternatives.
HEC-22 Equation 7.10 may overstate curb capture for longer openings. Check the FHWA-HRT-22-061 method when the entered or estimated full-capture length reaches 10 ft (3.05 m).
Q = (Kᵤ/n) Sₓ⁵ᐟ³ Sₗ¹ᐟ² T⁸ᐟ³ · d = TSₓ · Eₒ = 1 − (1 − min(W/T, 1))⁸ᐟ³.
Screening worksheet · Verify design using project criteria and site data.