Front Range, Colorado

Colorado PV row spacing for 9 AM–3 PM in winter

A residential installer spaces parallel 30° racks on a level site. The first pass targets six solar hours around winter noon.

Try it. Tighten the window to 10:00–14:00 and compare the minimum pitch and clear aisle. The shorter protection window can free space.

Inputs

US displays feet and 12-hour times. Metric displays meters and 24-hour times.

North is positive.
Measure the full rack from front lip to rear lip.
Positive means the ground rises toward the backs of the rows.

Inter-row shading cross-section

PV row spacing and shading rayA vertical section through two rows shows the signed ground grade, panel rise, and governing sun ray. 30° TILT0% GRADE2026-12-21PITCH 16.37 ft
Minimum row pitch
16.37 ft
Clear horizontal aisle
10.31 ft
Ground coverage ratio
37%
Governing solar time
3:00 PM
Projected row width
6.06 ft
Panel rise
3.5 ft

Pitch is horizontal, measured from one front edge to the next. Start, end, and governing times are solar time.

Design window
Solstice dateFacingStartEnd
2026-12-21180° S9:00 AM3:00 PM

Project neighboring rows into the same section

Identical parallel rows face the equator. Project the panel stack and solar ray onto the section perpendicular to the row, then increase the horizontal front-edge pitch until the panels stop overlapping along that ray.

The tool checks both endpoints and minute samples between them on the chosen solstice. A beam parallel to the grade can require unbounded spacing. The aisle is the pitch minus the horizontal panel projection. Include equipment access and structural setbacks separately.

Open array row spacing with the default settings

Common questions

Why can Colorado’s layout be governed near 9 AM or 3 PM?

Those endpoints have lower solar altitude than noon and can project longer shadows across rows.

How do I mark Colorado row pitch with a tape?

Mark a horizontal front-edge-to-front-edge distance perpendicular to the row. The clear aisle alone excludes row width.