Radiant Floor PEX Spacing & Loop Length Calculator

Lay out a heated floor by tubing spacing, tubing size and manifold distance. Estimate total tubing, balanced loops, manifold ports and water flow.

Floor and circuit geometry
ft²
ft

Supply and return leads both count toward the loop limit.

%

Add a margin for bends and irregular coverage if required.

Hydronic load
Btu/(h·ft²)
°F
Balanced loops / port pairs
3
Total PEX tubing
864 ft
Zone water flow
2.16 US gal/min

The loop count balances equal areas. Check pressure drop, actual routes and the floor’s heat output before selection.

Serpentine loop sketch

Serpentine PEX circuit layout3 balanced loops at 288 ft each. Maximum planned length 300 ft. 9 in on center3 loopsSupply / return manifold288 ft and 0.72 US gal/min per loop
The sketch represents equal-area circuits and paired leads. Use a scaled plan for route placement and bend geometry.
Length per loop with leads
288 ft
Planning limit per loop
300 ft
Active tubing across floor
756 ft
Supply + return lead per loop
36 ft
Water flow per loop
0.72 US gal/min
Total zone heat load
10,800 Btu/h
Download

How this calculation works

Active tubing length is net area ÷ spacing, plus the entered allowance. Add two times the one-way lead to every circuit. Divide active length by the usable length per loop and round up.

Each circuit serves an equal share of the area in this estimate. One supply-and-return port pair is needed per circuit. The planning limits are 300 ft for ½-in PEX and 400 ft for ⅝-in PEX, including leads.

Total water flow in US gallons per minute is load in Btu/h divided by 500.4 times the supply-to-return temperature drop in °F. Glycol concentration, operating temperature, pressure drop, floor output, bend radius and pump selection require project-specific checks.

References

Frequently asked questions

Are the manifold leads included in the 300 ft or 400 ft planning limit?

Yes. Each loop uses the one-way distance twice. The remaining length is available for active tubing inside the heated floor.

How many manifold connections does a four-loop floor need?

Specify four port pairs. That means four supply and four return connections. The flow estimate assumes the four loops share the zone load equally.