Worked example
720 ft² Slab with ⅝-Inch PEX and Four Loops
A small slab uses 8-inch spacing and a manifold 25 ft from the average loop entry. The installer is screening ⅝-inch PEX against a 400 ft planning cap.
Try it Switch to the ½-inch planning cap without changing spacing. Compare the number of circuits and the footage consumed by leads.
Results
Back to inputs ↑Enter valid inputs to calculate results and draw the diagram.
- Balanced loops / port pairs
- Total PEX tubing
- ft
- Zone water flow
- US gal/min
The loop count balances equal areas. Check pressure drop, actual routes and the floor’s heat output before selection.
Serpentine loop sketch
- Length per loop with leads
- ft
- Planning limit per loop
- ft
- Active tubing across floor
- ft
- Supply + return lead per loop
- ft
- Water flow per loop
- US gal/min
- Total zone heat load
- Btu/h
Inputs used
- Net heated floor area
- 720 ft²
- Tubing on-center spacing
- 8 in
- Nominal PEX size
- ⅝ in · 400 ft max
- One-way manifold lead per loop
- 25 ft
- Active tubing allowance
- 0 %
- Design floor heat flux
- 18 Btu/(h·ft²)
- Water supply–return temperature drop
- 12 °F
How this calculation works
Active tubing length is net area ÷ spacing, plus the entered allowance. Add two times the one-way lead to every circuit. Divide active length by the usable length per loop and round up.
Each circuit serves an equal share of the area in this estimate. One supply-and-return port pair is needed per circuit. The planning limits are 300 ft for ½-in PEX and 400 ft for ⅝-in PEX, including leads.
Total water flow in US gallons per minute is load in Btu/h divided by 500.4 times the supply-to-return temperature drop in °F. Glycol concentration, operating temperature, pressure drop, floor output, bend radius and pump selection require project-specific checks.
References
Frequently asked questions
Why does the 720 ft² slab need four circuits with a 400 ft cap?
Each circuit spends 50 ft on leads, leaving 350 ft active. Three circuits leave room for just 1,050 ft, while the slab needs 1,080 ft active.
Is an equal 320 ft circuit length mandatory in this slab?