Worked example
Single PEX Loop at the 300 ft Planning Limit
A 224 ft² addition uses 12-inch spacing and a 38 ft one-way lead. With no added layout allowance, active tubing and the two leads just fit the half-inch loop cap.
Try it Add a small layout allowance or increase the one-way lead by a foot. The loop count should rise because the original design has no spare length.
Results
Back to inputs ↑Enter valid inputs to calculate results and draw the diagram.
- Balanced loops / port pairs
- Total PEX tubing
- ft
- Zone water flow
- US gal/min
The loop count balances equal areas. Check pressure drop, actual routes and the floor’s heat output before selection.
Serpentine loop sketch
- Length per loop with leads
- ft
- Planning limit per loop
- ft
- Active tubing across floor
- ft
- Supply + return lead per loop
- ft
- Water flow per loop
- US gal/min
- Total zone heat load
- Btu/h
Inputs used
- Net heated floor area
- 224 ft²
- Tubing on-center spacing
- 12 in
- Nominal PEX size
- ½ in · 300 ft max
- One-way manifold lead per loop
- 38 ft
- Active tubing allowance
- 0 %
- Design floor heat flux
- 16 Btu/(h·ft²)
- Water supply–return temperature drop
- 10 °F
How this calculation works
Active tubing length is net area ÷ spacing, plus the entered allowance. Add two times the one-way lead to every circuit. Divide active length by the usable length per loop and round up.
Each circuit serves an equal share of the area in this estimate. One supply-and-return port pair is needed per circuit. The planning limits are 300 ft for ½-in PEX and 400 ft for ⅝-in PEX, including leads.
Total water flow in US gallons per minute is load in Btu/h divided by 500.4 times the supply-to-return temperature drop in °F. Glycol concentration, operating temperature, pressure drop, floor output, bend radius and pump selection require project-specific checks.
References
Frequently asked questions
Why does increasing this lead by one foot add a circuit?
The original loop uses exactly 300 ft. Adding a foot each way would need 302 ft, so it crosses the entered planning cap.
Should I order exactly 300 ft for the addition?
Use the plan and manufacturer requirements to check bend geometry, actual routing and spare length. The example leaves no allowance for field changes.