1,200 ft² Workshop with 12-Inch Radiant Spacing

A workshop slab has a low estimated heat flux and uses 12-inch tubing centers. Four planned ⅝-inch circuits each reach the manifold by a 15 ft lead.

Try it Increase the load from 15 to 22 Btu/h·ft² without editing area or spacing. Review the new total and per-circuit flow requirements.

Floor and circuit geometry
ft²
ft

Supply and return leads both count toward the loop limit.

%

Add a margin for bends and irregular coverage if required.

Hydronic load
Btu/(h·ft²)
°F
Balanced loops / port pairs
4
Total PEX tubing
1,320 ft
Zone water flow
2.4 US gal/min

The loop count balances equal areas. Check pressure drop, actual routes and the floor’s heat output before selection.

Serpentine loop sketch

Serpentine PEX circuit layout4 balanced loops at 330 ft each. Maximum planned length 400 ft. 12 in on center4 loopsSupply / return manifold330 ft and 0.6 US gal/min per loop
The sketch represents equal-area circuits and paired leads. Use a scaled plan for route placement and bend geometry.
Length per loop with leads
330 ft
Planning limit per loop
400 ft
Active tubing across floor
1,200 ft
Supply + return lead per loop
30 ft
Water flow per loop
0.6 US gal/min
Total zone heat load
18,000 Btu/h
Download

How this calculation works

Active tubing length is net area ÷ spacing, plus the entered allowance. Add two times the one-way lead to every circuit. Divide active length by the usable length per loop and round up.

Each circuit serves an equal share of the area in this estimate. One supply-and-return port pair is needed per circuit. The planning limits are 300 ft for ½-in PEX and 400 ft for ⅝-in PEX, including leads.

Total water flow in US gallons per minute is load in Btu/h divided by 500.4 times the supply-to-return temperature drop in °F. Glycol concentration, operating temperature, pressure drop, floor output, bend radius and pump selection require project-specific checks.

References

Frequently asked questions

Why can the workshop use wider spacing in this planning example?

The assumed design demand is relatively low. Assess the actual floor construction and required fluid temperatures before deciding whether wide spacing delivers enough heat.

How many manifold ports does the workshop sketch represent?

Four supply-and-return pairs serve the four circuits. The sizing calculation divides the total flow equally for a first estimate.