Worked example
2×6 Wall Retrofit with Two Inches of Polyiso
A remodeler plans to add two inches of continuous polyiso during a siding replacement. The existing 2×6 cavities have R-21 batts, and the selected foam design rating is 5.4 R per inch.
Try it Set foam thickness to zero to recover the pre-retrofit section. Restore the two inches and compare the change in effective R and the share of heat through framing.
Results
Back to inputs ↑Enter valid inputs to calculate results and draw the diagram.
- Effective assembly R
- R
- Assembly U-factor
- Btu/(h·ft²·°F)
- R lost to framing
- %
Compare the framing area fraction with the share of heat that goes through framing.
Assembly cross-section
- Nominal cavity-path R
- R
- Framing-path R
- R
- Continuous foam R
- R
- Framing area fraction
- %
- Heat through framing
- %
Inputs used
- Assembly
- Wall
- Framing material
- Wood
- Nominal framing depth
- 2 × 6 (5½ in)
- On-center spacing
- 16 in
- Framing fraction source
- Spacing estimate
- Installed cavity insulation R
- 21 R
- Exterior rigid foam
- Polyiso
- Continuous foam thickness
- 2 in
- Project foam R per thickness
- 5.4 R/in
- Interior air film R
- 0.68 R
- Interior finish R
- 0.45 R
- Sheathing and other layers R
- 0.62 R
- Exterior air film R
- 0.17 R
How this calculation works
Add the interior film, finish, sheathing, exterior film and continuous insulation to both paths. Add installed cavity R to the cavity path and framing-layer R to the stud path. Wood framing uses 1.25 R per inch of depth.
Weight the two conductances by area using U = (1 − f) ÷ R_cavity + f ÷ R_framing. Effective R = 1 ÷ U. The percentage loss compares effective R to the full cavity-path R. It can be negative when the framing layer has more resistance than the cavity fill.
Spacing presets assume 25% and 22% framing in walls, and 12% and 9% in ceilings, at 16 and 24 inches on center. Measure the fraction for a project takeoff. Foam ratings are starting assumptions. Use the product’s rating at representative temperatures.
Steel spreads heat sideways through the flanges. Its editable equivalent path resistance makes this a screening comparison. For steel design or documented compliance, use tested assembly data, a zone method or a validated thermal model.
References
Frequently asked questions
Why was 5.4 R per inch used for the polyiso retrofit?
It is an illustrative project rating for two-inch polyiso at the conditions being evaluated. Enter the selected product rating at a representative mean temperature.
Will the polyiso cover horizontal plates as well as vertical studs?
Only continuous coverage improves both paths as modeled. Interrupted regions around floor lines, penetrations and openings may need their own takeoff.