Steel-Stud Condo Wall with Continuous XPS

A condo enclosure team compares two inches of exterior XPS against an existing R-15 steel-stud cavity. Their screening inputs use 22% equivalent framing area and an R-1.3 framed-layer path.

Try it Try one and three inches of XPS. Use the results to compare direction and approximate magnitude while arranging a tested or modeled assembly check.

Framing and insulation
%

Include plates, headers and other framing in the area studied.

R

Assumed resistance of the framed layer along the steel path. Use a project-specific estimate when available.

R

Use the R-value at the actual cavity depth.

Continuous layers
in

Use 0 for an assembly without continuous foam.

R/in

Use 0 for material defaults (polyiso 5.7, XPS 5.0, EPS 3.8 R/in).

R
R
R
R
Effective assembly R
21.92 R
Assembly U-factor
0.046 Btu/(h·ft²·°F)
R lost to framing
18.6 %

Steel framing uses the entered equivalent path. Confirm the assembly with tested data or a zone model for specification work.

Assembly cross-section

Cavity and framing heat flow22% framing · 36.5% of heat through framing. Effective resistance 21.92 R. Continuous foam 10 R. IndoorsOutdoorsInsulated cavitySteel pathExterior foam22% framing · 36.5% of heat through framing
Layer widths and framing bands show the relative geometry of the model. The arrows follow the cavity and framing heat-flow paths.
Nominal cavity-path R
26.92 R
Framing-path R
13.22 R
Continuous foam R
10 R
Framing area fraction
22 %
Heat through framing
36.5 %
Download

How this calculation works

Add the interior film, finish, sheathing, exterior film and continuous insulation to both paths. Add installed cavity R to the cavity path and framing-layer R to the stud path. Wood framing uses 1.25 R per inch of depth.

Weight the two conductances by area using U = (1 − f) ÷ R_cavity + f ÷ R_framing. Effective R = 1 ÷ U. The percentage loss compares effective R to the full cavity-path R. It can be negative when the framing layer has more resistance than the cavity fill.

Spacing presets assume 25% and 22% framing in walls, and 12% and 9% in ceilings, at 16 and 24 inches on center. Measure the fraction for a project takeoff. Foam ratings are starting assumptions. Use the product’s rating at representative temperatures.

Steel spreads heat sideways through the flanges. Its editable equivalent path resistance makes this a screening comparison. For steel design or documented compliance, use tested assembly data, a zone method or a validated thermal model.

References

Frequently asked questions

Is R-1.3 the material R-value of a steel stud?

It is an assumed equivalent layer resistance for this rough example. Steel flange geometry changes the real heat flow, so obtain tested values or a zone-model result for specification work.

Why does the XPS help both sides of the condo wall comparison?

The continuous foam adds in-series resistance outside the insulated stud bays and the steel heat-flow path. The two paths then differ by less in relative terms.