WaterTreatLab

Chemical feed / Worked example

Standby Metering with Zero Dose

Model a chemical system in standby at zero target dose while the treatment process continues to flow.

Inputs

Process & solution
mg/L
%
Mass percent (w/w)
Pump & inventory
gph
gal
gal

Results

US customary
Liquid feed
0 gph 0 mL/min
Active chemical
0 lb/d 0 kg/d
Pump capacity used
0 %
Day-tank autonomy
No draw
Chemical metering circuitLive diagram
Chemical metering circuitThe day-tank fill shows remaining stock after 24 hours from a full tank. Day-tank autonomyNo drawLiquid stock feed0 gphMetering pumpProcess mainRequired pump output0 %10%90%
The day-tank fill shows remaining stock after 24 hours from a full tank.
Bulk-tank autonomy
No draw
Dose target
0 mg/L
Dose at rated flow
14.4 mg/L
Stock used per day
0 gal/d

For engineering planning. Operators must follow site-specific permits, chemical safety data sheets (SDS), manufacturer specifications, and certified regulatory sampling requirements.

Worked solution

These steps walk through the starting inputs in US customary units. Edit the calculator above to test a different operating point.

  1. A zero target gives zero active load and zero stock flow.
  2. At zero draw, the model displays “No draw” for autonomy and shows zero required pump output.

More worked examples

Hypochlorite Feed at 2 MGD

Calculate active chemical pounds per day, metering pump flow and day-tank autonomy for a 2 MGD hypochlorite case.

Equations & conventions

Active mass rate
W = 8.34 × Qₘɢᴅ × D

Q is US million gallons per day, D is mg/L of active chemical and W is lb/day. The tool uses the EPA operator convention of 8.34 exactly.

Liquid feed rate
q = W / (24 × 8.34 × SG × w)

w is active mass fraction, for example 0.125 at 12.5% w/w. The result is US gal/h. Use the stock-specific SG and the same active chemical basis as the dose target.

Capacity and inventory
Setting = 100q / qᵣₐₜₑ𝒹, autonomy = Vᵤₛₐᵦₗₑ / (24q)

Pump setting is the equivalent share of rated flow. Calibrate stroke and speed at actual pressure. Use liquid inventory above the unusable heel and any reserved stock.

Planning basis

The 10% and 90% marks flag turndown and capacity margin for review. The pump’s calibrated performance curve governs the actual setting. Dose and residual have distinct meanings in treatment.

Questions

Why is standby autonomy shown without a number of days?

Dividing by zero draw would give no finite depletion time. The stock volume remains available at the entered operating point.