Superior-Baffled Clearwell at Peak Flow
Calculate 42 min T₁₀ and 58.8 mg·min/L chlorine CT in a 150,000 gal clearwell at 2,500 gpm.
Disinfection / Worked example
Calculate the theoretical breakpoint for 1.2 mg/L ammonia-N and keep it separate from outlet residual and chlorine CT.
For engineering planning. Operators must follow site-specific permits, chemical safety data sheets (SDS), manufacturer specifications, and certified regulatory sampling requirements.
These steps walk through the starting inputs in US customary units. Edit the calculator above to test a different operating point.
Calculate 42 min T₁₀ and 58.8 mg·min/L chlorine CT in a 150,000 gal clearwell at 2,500 gpm.
Compare 40 min nominal detention with 4 min effective contact time in an unbaffled chlorine basin.
Compute effective chlorine CT in a 120,000 gal contact segment with an EPA poor baffling factor.
See a 120,000 gal contact basin exactly match a 50 mg·min/L target with average baffling.
Estimate chlorine CT with a 10,000 gal idealized pipe segment at 500 gpm and a factor of 1.0.
T = V / Q, T₁₀ = T × BFUse operating volume and peak flow for the same segment. EPA Table 4-2 uses 0.1, 0.3, 0.5, 0.7 and 1.0 for progressively improved baffling. Use approved tracer results when available.
CT = C × T₁₀, CT ratio = CT / CTrequiredC is the measured disinfectant residual at the end of the segment. Use the applicable required CT for the disinfectant, organism, inactivation goal, temperature and pH.
Dᵦ = 7.6 × ammonia-N + other demandExpress ammonia as N and chlorine as Cl₂. The optional residual allowance is added separately. Determine actual breakpoint from site demand testing and approved operating procedures.
A CT ratio at or above one means the calculated value meets your entered target for this segment. A regulated inactivation determination also requires the governing method, sampling, operating envelope and any segment accounting.
Reaction products, pH, temperature and other compounds influence real demand. Confirm breakpoint under the actual treatment conditions.
WaterTreatLab / Ammonia Breakpoint Demand and CT
US customary units
For engineering planning. Operators must follow site-specific permits, chemical safety data sheets (SDS), manufacturer specifications, and certified regulatory sampling requirements.