WaterTreatLab

Disinfection / Worked example

Plug-Flow Pipe Contact Segment

Estimate chlorine CT with a 10,000 gal idealized pipe segment at 500 gpm and a factor of 1.0.

Inputs

Contact segment
mg/L
gal
gpm
mg·min/L
Breakpoint screen
mg/L as N
mg/L as Cl₂

Results

US customary
Achieved CT
36 mg·min/L
Effective time T₁₀
20 min
CT / target
1.125 ×
Theoretical time T
20 min
Contact basinLive diagram
Contact basinFlow path and effective contact time for the selected baffling class. InletOutlet residualPlug-flow pipeTheoretical time20 minEffective T₁₀20 minCT / target1.125 ×
Flow path and effective contact time for the selected baffling class.
Breakpoint demand
2.5 mg/L as Cl₂
Dose incl. entered residual
4.3 mg/L as Cl₂

For engineering planning. Operators must follow site-specific permits, chemical safety data sheets (SDS), manufacturer specifications, and certified regulatory sampling requirements.

Worked solution

These steps walk through the starting inputs in US customary units. Edit the calculator above to test a different operating point.

  1. With the idealized plug-flow factor, all 20 min nominal time enters the T₁₀ estimate.
  2. The 1.8 mg/L residual gives 36 mg·min/L and a ratio of 1.125 to the entered target.

More worked examples

Equations & conventions

Theoretical and effective time
T = V / Q, T₁₀ = T × BF

Use operating volume and peak flow for the same segment. EPA Table 4-2 uses 0.1, 0.3, 0.5, 0.7 and 1.0 for progressively improved baffling. Use approved tracer results when available.

Disinfection exposure
CT = C × T₁₀, CT ratio = CT / CTrequired

C is the measured disinfectant residual at the end of the segment. Use the applicable required CT for the disinfectant, organism, inactivation goal, temperature and pH.

Theoretical breakpoint
Dᵦ = 7.6 × ammonia-N + other demand

Express ammonia as N and chlorine as Cl₂. The optional residual allowance is added separately. Determine actual breakpoint from site demand testing and approved operating procedures.

Planning basis

A CT ratio at or above one means the calculated value meets your entered target for this segment. A regulated inactivation determination also requires the governing method, sampling, operating envelope and any segment accounting.

Questions

What pipe volume belongs in this contact-time example?

Use the water-filled volume of the actual contact segment at the matching peak flow and monitor the residual at its endpoint.