WaterTreatLab

Gravity separation / Worked example

80-Foot Circular Drinking-Water Basin

Calculate area, surface overflow, sidewater detention and weir loading for an 80 ft circular water sedimentation basin.

Inputs

Plant & geometry
ft
ft
Hydraulic loading
MGD
ft

Results

US customary
Surface overflow
596.83 gpd/ft² 1.0133 m/h
Detention time
4.2113 h
Weir loading
12,500 gpd/ft 155.24 m³/(m·d)
Settling area
5,026.5 ft²
Sedimentation basin sectionLive diagram
Sedimentation basin sectionSection profile and hydraulic loading for a single basin. InfluentCircular basinEffluent weirPlan area5,026.5 ft²Sidewater depth14 ftWeir loading12,500 gpd/ft
Section profile and hydraulic loading for a single basin.
Active basin volume
526,420 gal

For engineering planning. Operators must follow site-specific permits, chemical safety data sheets (SDS), manufacturer specifications, and certified regulatory sampling requirements.

Worked solution

These steps walk through the starting inputs in US customary units. Edit the calculator above to test a different operating point.

  1. The plan area is π × 40² = 5,026.55 ft². At 3 MGD the SOR is about 597 gpd/ft².
  2. The 14 ft sidewater depth gives 4.21 h nominal detention. A 240 ft active weir receives 12,500 gpd/ft.

More worked examples

Equations & conventions

Surface area and volume
A = πD²/4 or L × W, V = A × SWD

Use the plan area and operating sidewater depth. The idealized prism/cylinder excludes volume changes from hoppers, internals and sludge.

Surface overflow and detention
SOR = Q / A, HRT = V / Q

With Q in gal/day and A in ft², SOR is gpd/ft². With V in gal, multiply V/Q by 24 to get hours.

Weir loading
WOR = Q / Lweir

Enter effective, active weir length. Count both contributing launder sides when both accept flow. Use one basin’s flow, area and weir length.

Planning basis

Ten States §4.2.5 gives 4 h conventional water sedimentation, an authority-approved reduced-time pathway at 0.5 gpm/ft² or demonstrated equivalent settling, and 20,000 gpd/ft outlet loading. EPA primary wastewater reference bands are 600–1,200 gpd/ft², 1–4 h and 10,000–20,000 gpd/ft. AWWA M37 covers water clarification design context.

Questions

Why is the active weir 240 ft instead of the basin circumference?

The operating overflow length can differ from the outside circumference. Use the edges or openings that actually convey effluent.