80-Foot Circular Drinking-Water Basin
Calculate area, surface overflow, sidewater detention and weir loading for an 80 ft circular water sedimentation basin.
Gravity separation / Worked example
Use a single basin’s 1.8 MGD share of plant flow to calculate a 110 × 42 ft sedimentation unit’s hydraulic loading.
For engineering planning. Operators must follow site-specific permits, chemical safety data sheets (SDS), manufacturer specifications, and certified regulatory sampling requirements.
These steps walk through the starting inputs in US customary units. Edit the calculator above to test a different operating point.
Calculate area, surface overflow, sidewater detention and weir loading for an 80 ft circular water sedimentation basin.
Scale rectangular sedimentation area, 16 ft sidewater depth and a 150 ft weir for a 2.4 MGD flow.
Compare a 90 ft primary wastewater clarifier at 6 MGD with EPA surface, detention and outlet-weir reference ranges.
Check a compact rectangular basin at 2.2 MGD with reduced hydraulic detention and high weir loading.
Calculate the hydraulic loading of a circular secondary clarifier before evaluating solids loading and settling.
A = πD²/4 or L × W, V = A × SWDUse the plan area and operating sidewater depth. The idealized prism/cylinder excludes volume changes from hoppers, internals and sludge.
SOR = Q / A, HRT = V / QWith Q in gal/day and A in ft², SOR is gpd/ft². With V in gal, multiply V/Q by 24 to get hours.
WOR = Q / LweirEnter effective, active weir length. Count both contributing launder sides when both accept flow. Use one basin’s flow, area and weir length.
Ten States §4.2.5 gives 4 h conventional water sedimentation, an authority-approved reduced-time pathway at 0.5 gpm/ft² or demonstrated equivalent settling, and 20,000 gpd/ft outlet loading. EPA primary wastewater reference bands are 600–1,200 gpd/ft², 1–4 h and 10,000–20,000 gpd/ft. AWWA M37 covers water clarification design context.
Replace 1.8 MGD with the measured or design flow for the basin being evaluated.
WaterTreatLab / One Basin in a Parallel Sedimentation Train
US customary units
For engineering planning. Operators must follow site-specific permits, chemical safety data sheets (SDS), manufacturer specifications, and certified regulatory sampling requirements.