WaterTreatLab

Gravity separation / Worked example

Primary Clarifier with High Weir Load

Compare a 90 ft primary wastewater clarifier at 6 MGD with EPA surface, detention and outlet-weir reference ranges.

Inputs

Plant & geometry
ft
ft
Hydraulic loading
MGD
ft

Results

US customary
Surface overflow
943.14 gpd/ft² 1.6012 m/h
Detention time
2.2843 h
Weir loading
21,429 gpd/ft 266.13 m³/(m·d)
Settling area
6,361.7 ft²
Sedimentation basin sectionLive diagram
Sedimentation basin sectionSection profile and hydraulic loading for a single basin. InfluentCircular basinEffluent weirPlan area6,361.7 ft²Sidewater depth12 ftWeir loading21,429 gpd/ft
Section profile and hydraulic loading for a single basin.
Review the operating point
  • Weir loading is outside the 10,000–20,000 gpd/ft EPA primary-settling reference range.
Active basin volume
571,070 gal

For engineering planning. Operators must follow site-specific permits, chemical safety data sheets (SDS), manufacturer specifications, and certified regulatory sampling requirements.

Worked solution

These steps walk through the starting inputs in US customary units. Edit the calculator above to test a different operating point.

  1. A 90 ft diameter gives about 6,362 ft². SOR is about 943 gpd/ft² and HRT is about 2.28 h at the given depth.
  2. Six million gallons per day divided by 280 ft gives 21,429 gpd/ft, above the primary weir reference band.

More worked examples

Equations & conventions

Surface area and volume
A = πD²/4 or L × W, V = A × SWD

Use the plan area and operating sidewater depth. The idealized prism/cylinder excludes volume changes from hoppers, internals and sludge.

Surface overflow and detention
SOR = Q / A, HRT = V / Q

With Q in gal/day and A in ft², SOR is gpd/ft². With V in gal, multiply V/Q by 24 to get hours.

Weir loading
WOR = Q / Lweir

Enter effective, active weir length. Count both contributing launder sides when both accept flow. Use one basin’s flow, area and weir length.

Planning basis

Ten States §4.2.5 gives 4 h conventional water sedimentation, an authority-approved reduced-time pathway at 0.5 gpm/ft² or demonstrated equivalent settling, and 20,000 gpd/ft outlet loading. EPA primary wastewater reference bands are 600–1,200 gpd/ft², 1–4 h and 10,000–20,000 gpd/ft. AWWA M37 covers water clarification design context.

Questions

Which hydraulic result flags the primary clarifier example?

Weir loading exceeds 20,000 gpd/ft. The surface loading and detention are within the cited EPA primary ranges.