WaterTreatLab

Gravity separation / Worked example

One Basin in a Parallel Sedimentation Train

Use a single basin’s 1.8 MGD share of plant flow to calculate a 110 × 42 ft sedimentation unit’s hydraulic loading.

Inputs

Plant & geometry
ft
ft
ft
Hydraulic loading
MGD
ft

Results

US customary
Surface overflow
389.61 gpd/ft² 0.66146 m/h
Detention time
5.5296 h
Weir loading
9,473.7 gpd/ft 117.66 m³/(m·d)
Settling area
4,620 ft²
Sedimentation basin sectionLive diagram
Sedimentation basin sectionSection profile and hydraulic loading for a single basin. InfluentRectangular basinEffluent weirPlan area4,620 ft²Sidewater depth12 ftWeir loading9,473.7 gpd/ft
Section profile and hydraulic loading for a single basin.
Active basin volume
414,720 gal

For engineering planning. Operators must follow site-specific permits, chemical safety data sheets (SDS), manufacturer specifications, and certified regulatory sampling requirements.

Worked solution

These steps walk through the starting inputs in US customary units. Edit the calculator above to test a different operating point.

  1. For two equal online basins at 3.6 MGD total, enter 1.8 MGD per basin.
  2. The 4,620 ft² area and 12 ft side depth give about 390 gpd/ft² and 5.53 h nominal HRT. The 190 ft weir receives about 9,474 gpd/ft.

More worked examples

Equations & conventions

Surface area and volume
A = πD²/4 or L × W, V = A × SWD

Use the plan area and operating sidewater depth. The idealized prism/cylinder excludes volume changes from hoppers, internals and sludge.

Surface overflow and detention
SOR = Q / A, HRT = V / Q

With Q in gal/day and A in ft², SOR is gpd/ft². With V in gal, multiply V/Q by 24 to get hours.

Weir loading
WOR = Q / Lweir

Enter effective, active weir length. Count both contributing launder sides when both accept flow. Use one basin’s flow, area and weir length.

Planning basis

Ten States §4.2.5 gives 4 h conventional water sedimentation, an authority-approved reduced-time pathway at 0.5 gpm/ft² or demonstrated equivalent settling, and 20,000 gpd/ft outlet loading. EPA primary wastewater reference bands are 600–1,200 gpd/ft², 1–4 h and 10,000–20,000 gpd/ft. AWWA M37 covers water clarification design context.

Questions

What if both basins do not receive an equal share?

Replace 1.8 MGD with the measured or design flow for the basin being evaluated.