Poisson Spare-Parts Sizing Calculator

Find the minimum stock for a lead-time protection probability and calculate stockout risk, expected backorders and inventory value.

Inputs

h
h
0–1
cost units
Blank uses the computed minimum stock.
PassStock covers the protection target
Minimum stock
6
Protection
99.1816%
Mean demand
2.24
Backorders
0.0110685

Lead-time demand and stock protection

Poisson demand probability and shelf-stock protectionDemand probability · PMF0%15.1%30.2%05914Lead-time demandStock protection · CDF0%50%100%05914Spare units on shelfProtectionStock / goal

Demand bars show the PMF and the line shows the cumulative probability of covering demand with a given stock level.

Download

Detailed results

Evaluated shelf stock
6 units
Stockout probability
0.81837165 %
Protection target
99 %
Shelf inventory value
1,920 cost units

Formula trace

  1. λ = M L / MTBFOver the replenishment window the fleet has mean demand 2.24.
  2. Pr(D ≤ S) = Q(S+1, λ)For S = 6, the cycle protection probability is 0.99181628.
  3. S* = min {S ≥ 0 : Pr(D ≤ S) ≥ P*}The minimum whole stock is 6.
  4. EBO(S) = ∑ (d−S) Pr(D=d) for d > SExpected backlog is 0.01106849 units per lead-time window.

Model assumptions

Demand is independent with constant rates and fixed replenishment lead time. Protection is cycle service probability Pr(D ≤ S). Inventory value is purchase cost times stocked units.

Method and sources

Worked examples