Worked example

120-Gallon Reef Dual Drains with One Blocked

A 120-gallon net display uses two modeled 1.25 in ID drain paths and a 720 GPH return. Compare the two-opening estimate with the same system after one path is blocked.

See the worked calculation

Inputs

View results
Display and return
in
in
US gal
US gal/h

Use the pump curve at total head or a flow measurement.

Identical parallel drains

Count paths that can independently take flow. Exclude dry emergency paths if you do not know their capacity.

in
in

Water head across the inlet in the modeled condition.

0.60 models a sharp opening. Calibrate with a flow test.

Power-off reserve
in
in

Test without relying on a check valve.

US gal

Count trapped volumes outside the display footprint.

in
in
in

Use the area available for rising water across compartments.

%
Auto top-off
US gal
US gal/day
Screened flow with one drain blocked
504 US gal/h
Free volume after cutoff
7.03 US gal
Sump turnover per hour
6 ×
Operating and power-off sump levelsNormal freeboard 4 in. The water rises 1.74 in when the return stops. Sump sectionLowest spill pointPower-off rise1.74 inVolume after cutoff7 US galNormal levelPower-off level
Normal & power-off sump levels

Calculation details

ATO reservoir runtime
15.4 days
Screened drain capacity
1,008 US gal/h
Return at 3× turnover
360 US gal/h
Return at 10× turnover
1,200 US gal/h
Total power-off drain-down
5.44 US gal
Theoretical freeboard storage
12.47 US gal
Power-off rise in sump
1.74 in
Free volume after selected allowance
5.4 US gal
  • With one drain blocked, the remaining screened capacity is below the return flow. Verify the emergency overflow can carry the full return flow.
  • Confirm the result during a supervised outage and restart test.

Input measurements

Display inside length
48 in
Display inside width
24 in
Actual display water
120 US gal
Delivered return flow
720 US gal/h
Counted drains
2
Actual pipe inside diameter
1.25 in
Effective inlet head
2.5 in
Inlet discharge coefficient
0.6
Drop until the weir stops
0.5 in
Drop until return siphon breaks
0.85 in
Additional draining pipes and box
1.2 US gal
Sump usable inside length
40 in
Sump usable inside width
18 in
Normal level to lowest spill point
4 in
Extra allowance above drain-down
30 %
Usable freshwater reservoir
10 US gal
Observed daily evaporation
0.65 US gal/day

Supervise a real power-off and restart test before relying on the sump. Test the emergency drain and ATO cutoffs, and confirm salinity with a calibrated instrument before returning the system to livestock use.

Worked calculation

These numbers use the original example measurements. The calculator above updates as you edit.

  1. Find the power-off water volume

    (48 in × 24 in) × 0.85 in → 4.24 US gal; + 1.2 US gal = 5.44 US gal

    Use the larger of the weir and siphon drops. Add the extra water draining outside the display footprint.

  2. Compare it with sump freeboard

    12.47 US gal freeboard − 5.44 US gal drain-down = 7.03 US gal remaining

    Subtract 1.63 US gal of planned reserve for a margin of 5.4 US gal.

  3. Screen the drain and return

    Q per drain = 0.6 × π × (31.75 mm ÷ 2)² × √(2g × 6.35 cm) → 504 US gal/h

    Use consistent SI units in the orifice formula. 2 drain paths screen at 1,008 US gal/h. 720 US gal/h ÷ 120 US gal gives 6× per hour.

  4. Estimate top-off runtime

    10 US gal ÷ 0.65 US gal/day → 15.38 days

    Time the reservoir against actual evaporation and its usable cutoff level.

Frequently asked questions

Do two overflow drains give measurable redundancy on a 120-gallon reef?

There is redundancy only if the remaining path can accept the actual return flow under its real conditions. Test the main path blocked with supervision.

When should a dry emergency drain be included in a capacity calculation?

Include it only for an operating scenario where it is submerged as designed and its performance is verified. Ordinary running capacity excludes a dry path.