Worked example
1-Inch Aquarium Overflow Drain GPH at 2 Inches of Head
This example measures a 26.6 mm inside diameter in one nominal 1-inch PVC drain. Use two inches of effective head and a 0.60 inlet discharge coefficient.
See the worked calculationInputs
Results
Edit inputs1-Inch Aquarium Overflow Drain GPH at 2 Inches of Head
AquariumReefLab spec sheet · https://calcsheetlab.com/aquariumreeflab/guides/one-inch-aquarium-overflow-drain-gph/
- Screened drain capacity
- 317 US gal/h
- Free volume after cutoff
- 5.32 US gal
- Sump turnover per hour
- 5.8 ×
Calculation details
- ATO reservoir runtime
- 15.4 days
- Screened flow with one drain blocked
- 0 US gal/h
- Return at 3× turnover
- 180 US gal/h
- Return at 10× turnover
- 600 US gal/h
- Total power-off drain-down
- 5.44 US gal
- Theoretical freeboard storage
- 10.76 US gal
- Power-off rise in sump
- 2.02 in
- Free volume after selected allowance
- 3.69 US gal
- Return flow exceeds the screened drain capacity. Reduce flow and verify the drain system.
- Confirm the result during a supervised outage and restart test.
Input measurements
- Display inside length
- 48 in
- Display inside width
- 24 in
- Actual display water
- 60 US gal
- Delivered return flow
- 350 US gal/h
- Counted drains
- 1
- Actual pipe inside diameter
- 1.04724 in
- Effective inlet head
- 2 in
- Inlet discharge coefficient
- 0.6
- Drop until the weir stops
- 0.5 in
- Drop until return siphon breaks
- 0.85 in
- Additional draining pipes and box
- 1.2 US gal
- Sump usable inside length
- 35.5 in
- Sump usable inside width
- 17.5 in
- Normal level to lowest spill point
- 4 in
- Extra allowance above drain-down
- 30 %
- Usable freshwater reservoir
- 10 US gal
- Observed daily evaporation
- 0.65 US gal/day
Supervise a real power-off and restart test before relying on the sump. Test the emergency drain and ATO cutoffs, and confirm salinity with a calibrated instrument before returning the system to livestock use.
Worked calculation
These numbers use the original example measurements. The calculator above updates as you edit.
Find the power-off water volume
(48 in × 24 in) × 0.85 in → 4.24 US gal; + 1.2 US gal = 5.44 US gal
Use the larger of the weir and siphon drops. Add the extra water draining outside the display footprint.
Compare it with sump freeboard
10.76 US gal freeboard − 5.44 US gal drain-down = 5.32 US gal remaining
Subtract 1.63 US gal of planned reserve for a margin of 3.69 US gal.
Screen the drain and return
Q per drain = 0.6 × π × (26.6 mm ÷ 2)² × √(2g × 5.08 cm) → 317 US gal/h
Use consistent SI units in the orifice formula. 1 drain path screen at 317 US gal/h. 350 US gal/h ÷ 60 US gal gives 5.83× per hour.
Estimate top-off runtime
10 US gal ÷ 0.65 US gal/day → 15.38 days
Time the reservoir against actual evaporation and its usable cutoff level.
Frequently asked questions
Why is the inside diameter not exactly one inch for this PVC drain?
Nominal pipe size is a trade size. Actual bore varies by pipe schedule and material. Use the inside diameter from your pipe or its datasheet.
Does doubling inlet head double a 1-inch drain’s flow estimate?
No. The screening calculation uses the square root of head. Doubling head multiplies the estimate by about 1.41 for the same opening and coefficient.